    DB:4.90:In Cutover Phase What Is The Abap Role kz






    Hi Experts ,

    Cutover Phase is the Final Preparation Phase before Go-live ie for a implemetation or an Upgrade Project is it ?

    and what is an TECHINCAL CONSUTANTA ROLE in this Cutover Phase ..what do they do ? what are the activities they do ???? Testing is done in this phase ?? regressive testing is it done by ABAPERS???

    Thank you

    aarushi

    DB:4.90:In Cutover Phase What Is The Abap Role kz


    Hi Experts ,

    Cutover Phase is the Final Preparation Phase before Go-live ie for a implemetation or an Upgrade Project is it ?

    and what is an TECHINCAL CONSUTANTA ROLE in this Cutover Phase ..what do they do ? what are the activities they do ???? Testing is done in this phase ?? regressive testing is it done by ABAPERS???

    Thank you

    aarushi

  • RELEVANCY SCORE 3.67

    DB:3.67:Cutover Phase 8d






    Hi,

    What is cutover phase? What responsibilities a MM guy has in cutover phase? A detailed explaination will be highly useful.

    Thanks,

    Kumar

    DB:3.67:Cutover Phase 8d


    HI,

    Cutover comes in the final prearation phase.

    In this phase, you complete testing, end user training, system

    management and cutover activities to finalize your readiness to go live. Furthermore, the Final

    Preparation phase serves to resolve all critical open issues. Upon successful completion of this phase,

    you will be ready to run your business in your live R/3 System.

    Cut Over Plan - The details of how to move to the production environment and go live.

    1. Production support cutover plan

    2. End user training plan

    3. Test plan(s)

    4. Conversion check list

    5. Data transfer list

    6. Interface check list

    7. System administration

    8. End user documentation

    9. Approve the Production System

    10. Secure Production Environment

    11. Verify Users are Ready

    Thanks Regards,

    Kiran

  • RELEVANCY SCORE 3.48

    DB:3.48:Abap ka






    Sir

    What is the role of SAP ABAP consultant in an Implementation project?

    DB:3.48:Abap ka


    Hi,

    Creating the following object where SAP standard is not suported for bussiness.

    ABAP object ( Like report,Module pool)

    Enhancement(userexit,Badi)

    BAPI

    Forms(SAP script,Smartform)

    L.Velu

  • RELEVANCY SCORE 3.48

    DB:3.48:Cutover Activities 7z



    Hi SAP Gurus

    What are the cutover activities followed for PP module?

    Regards

    Rohit

    DB:3.48:Cutover Activities 7z


    Production Planning / Master data:

    For Production planning, only master data shall be migrated to SAP. In the 1st Stage, there is no master data. Following is the master data elements relevant for PP:

    - Bill of materials

    - Routing.

    - Work Centres.

    Transaction data:

    As of the cut off date, ideally there should not be any work in process. All the open production orders should be closed and semi finished goods should be dismantled and should be added to Raw materials. This strategy should be followed for all production orders where lead time to complete the production order is not large.

    Since, the production orders are for longer duration and it is not possible to dismantle the product and add it to inventory, following can be the strategy for migrating the data to SAP:

    - Create a material master for the work in process and set the standard price as the cost incurred for that product (ie. Work in process)

    - Create a bill of material (which will be used only for this production order) including this material and other materials still to be consumed.

    - Create Routing for rest of the production process.

    - Bring the work in process material into inventory as of the cut off date.

    - Create the production orders in SAP for the Work in process and issue materials to production order.

    Complete the production process after the cut off date of the project.

    Regards

    R.Brahmankar

  • RELEVANCY SCORE 3.17

    DB:3.17:Cutover Strategy With Material Ledger az



    Hi Experts

    Please some one help me on this process. I am implementing sap fresh system with material ledger. can any body tell cutover process? what is the difference with material ledger and without material ledger?

    Thanks in Advance

    Best Regards

    Appu

    DB:3.17:Cutover Strategy With Material Ledger az


    Hi Appu,

    You could go thru the procedure given in SAP note 596558. The note also described the impact of Material ledger activation.

    Regards, Gordon

  • RELEVANCY SCORE 3.04

    DB:3.04:Cutover And Data Migration xp



    I am SAP CRM Consultant.I have some queries, please clarify and send some relevant documents.

    In Data Migration Plan and sign off

    1. Data Reconciliation

    2. Control reports

    In Cutover Plan

    1. Proper cutover plan and sign off

    2. Cutover failover plan

    3. Back out plans in case of false go live

    4. Cutover rehersal and the % of data used

    5. Down time during cutover

    6. Cut over plan distribution

    I want to know the significance of these above mentioned topics in Standard Implementation processes, and if not in place what will be possible implications in go live?

    Please send me if you have any Docs for the same.

    Nalinakumar

    nalinakumar.b@hcl.in (or) nalinakumar@gmail.com

    DB:3.04:Cutover And Data Migration xp


    I am SAP CRM Consultant.I have some queries, please clarify and send some relevant documents.

    In Data Migration Plan and sign off

    1. Data Reconciliation

    2. Control reports

    In Cutover Plan

    1. Proper cutover plan and sign off

    2. Cutover failover plan

    3. Back out plans in case of false go live

    4. Cutover rehersal and the % of data used

    5. Down time during cutover

    6. Cut over plan distribution

    I want to know the significance of these above mentioned topics in Standard Implementation processes, and if not in place what will be possible implications in go live?

    Please send me if you have any Docs for the same.

    Nalinakumar

    nalinakumar.b@hcl.in (or) nalinakumar@gmail.com

  • RELEVANCY SCORE 2.98

    DB:2.98:Web Interface For Role Menu Web Item 89



    Hi,

    Many times i've used the web interface for Tables to change the structure or contents of a table. For this, we create an ABAP class and set the superclass to CL_RSR_WWW_MODIFY_TABLE.

    I want to do something similar to the Role Menu. What is the superclass for role menus?

    Thanks.

    DB:2.98:Web Interface For Role Menu Web Item 89


    You will have to write some nasty Javascript on the front end side which will add the icons next to the favs or create a BSP application to build the role menu using the function module 'RSBB_NODES_READ_WITH_FILTER'. With the BSP application you have the felxibility for creating the Role menu the way you want it.

    Thanks.

  • RELEVANCY SCORE 2.96

    DB:2.96:About Macros 79



    Hi what is the use of macros in ABAP programming ?

    What is the role of place holders in macros ?

    DB:2.96:About Macros 79


    hi ,

    If you want to reuse the same set of statements more than once in a program, you can include them in a macro. For example, this can be useful for long calculations or complex WRITE statements. You can only use a macro within the program in which it is defined, and it can only be called in lines of the program following its definition.

    Yes, you can get the same results without using them, but will have to explicitly put the code each time you want to perform the operation it does.

    Using Macros is a Programming Utility to avoid repetitive coding in a Program.

    The Macros used in HR reports tied to PNP are stored in the table TRMAC. Go into SE16 and display the Table contents.

    check this also...

    http://help.sap.com/saphelp_nw04/helpdata/en/f1/0a55f9e09411d2acb90000e829fbfe/content.htm

    regards,

    venkat.

    Edited by: venkat appikonda on Mar 18, 2008 7:49 PM

  • RELEVANCY SCORE 2.93

    DB:2.93:Saint+Ddic _Activation Phase Issue 1k



    HI ALL,

    I am upgrading through SAINT ERP 6.0 EHP6 ready system ,Now I am in the phase of DDIC _ACTIVATION ,while mass configuratio,

    I ma facing issue job RDDMASGL is failing due to ST22 dump.

    Category ABAP Programming Error

    Runtime Errors COMPUTE_INT_PLUS_OVERFLOW

    Except. CX_SY_ARITHMETIC_OVERFLOW

    ABAP Program RADIXCHK

    Application Component BC-DWB-DIC-AC

    Date and Time 14.06.2013 11:27:59

    Any one suggest how to resolve the issue

    Thanks

    What happened?

    Error in the ABAP Application Program

    The current ABAP program "RADIXCHK" had to be terminated because it has

    come across a statement that unfortunately cannot be executed.

    DB:2.93:Saint+Ddic _Activation Phase Issue 1k


    During SP import, SNOTE is locked. You will have to implement thesource code correction manually with the help of your abaper.This is as per SAP system design.So You just need to change on REPS SDB1FHDB using SE38/SE80 tcode.

  • RELEVANCY SCORE 2.88

    DB:2.88:Sap Sd Precutover And Cutover Strategy zz



    Hi Guys,

    Can any one help me out, Like we are going for Implementation of a project, As I am an SAP SD consultant how exactly i need to gather requirement and what are the templets and tools required in it . moreover till which phase of implementation my work would be. and what is cut-over strategy, and pre cut-over strategy.

    Thanks

    DB:2.88:Sap Sd Precutover And Cutover Strategy zz


    Hi Sam,

    If you are assign to project as a SAP SD consultant then client will provide you the documents, In which they write there requirement in a laymen language, like how the process going on in there industry.

    You have to read those douments and prepare your own document in that way that how you will prepare the system which meet their requirement. we call it blueprint stage.

    If you have any doubt on any point then client also arrange that facility, you will ask the question to the related feild person.

    After getting the answer, you prepare the document and complete it. after that you start configuring the system that stage we called realization.

    Hope this helps,

    Regards,

    MT

  • RELEVANCY SCORE 2.86

    DB:2.86:Abap General 9k



    Hi ,

    WHAT IS THE ROLE OF EXTENDED SYNTAX CHECK IN PERFORMANCE TUNING ?

    DB:2.86:Abap General 9k


    Hi,

    Extended syntax check is done to perform static checks, which are too time consuming for the normal syntax check. The extended program check returns both errors and warnings and it is possible to run either individual specialized tests or one whole standard check.

    Syntax Errors (Red Light)

    When we have an error in our program, the check stops and returns an error message. In many cases the system offers a possible correction of the error.

    We can activate a program that has syntax errors but we cannot generate and execute it. Syntax errors are regarded as fatal by the extended program check and it is obligatory to remove them.

    Syntax warnings (Yellow Light)

    The syntax check does not stop at warnings and the program is basically executable. Syntax warnings should be taken care of because they may lead to unexpected errors.

    bWe can perform the extended program check only on active sources./b

    We can either use Transaction SLIN or in SE38 through menu bar, we can carry out the extended syntax check ( Program -- Check -- Extended program check).

    Hope your question is answered.

    Reward all the useful answers.

    Regards

    Sayee

    Message was edited by:

    Sayee

  • RELEVANCY SCORE 2.86

    DB:2.86:In Upgradation Project,Role Of Sap Xi Abap Consultant xx



    hi expects,

    in upgradation project what would the role of sap xi abap consultant.and what would the team size(how many developer would be there in the team).

    DB:2.86:In Upgradation Project,Role Of Sap Xi Abap Consultant xx


    Hi Rohit,

    The role of xi consultatn is configuration and checking, and abap consultant to be check funtional problem is comes then little changes in programe and spau, spad will be done by abaper. The total team size is one xi ane one abaper is required.

    Regards,

    Anil

  • RELEVANCY SCORE 2.86

    DB:2.86:Cutover Stratergy jj



    Hi all

    let me know what is the CUTOVER STRATEGY?

    Which strategy used for PP module?

    Thanks in advance

    Sriram

    DB:2.86:Cutover Stratergy jj


    dear sriram,

    Cutover strategy depends upon how the organizations design their data load strategies. Normally, you decide the sequence of Data loads for Configuration settings, Master data, Transaction data which follows whom and then you make a copy of the system as a Production system a day before and after checking the successful data loads, you go-live 100% or partial again depending upon organizational setup and policies.

    Cutover planning is highly site specific. There's no thumb rule. The stock data as on the date of going live should be correctly entered. But stock being a highly dynamic quantity, the strategy for loading should be crystal clear. Then you have to load all the back dated transaction on the stock. Some stock comes into your plant/storage location as return and some stock is actually delivered to your customer through sales orders of various kinds.

    Hope this helps...Reward your points if it is useful

    -gide

  • RELEVANCY SCORE 2.85

    DB:2.85:Pi Cutover Plan 3f



    Hello sdn

    What activities need to be part of PI cutover plan ?

    Please advise.

    Thank you.

    DB:2.85:Pi Cutover Plan 3f


    Hi,

    It completely depends on the project you are working on.

    But roughly, it should have to have all the activities including sender and receiver application systems PI would be carrying out before Go-Live.

    It should have all the steps in correct sequence with the correct date and time that would be taking place by Sender/Receiver applications and PI.

    Example: Master data upload activity in case of Idoc scenarios.

    -Supriya.

  • RELEVANCY SCORE 2.85

    DB:2.85:Cutover Activity kf



    Hi guys,

    During SD cutover activity apart from open Enquires, Quotations, Orders, Deliveries what other things we need to consider?.

    How recording can be done for this using SHDB?

    Please guide on above.

    Thanks

    Shiv

    DB:2.85:Cutover Activity kf


    Hi Pls Make a small search in sdn before posting your query , There no of posts on the issue

  • RELEVANCY SCORE 2.84

    DB:2.84:Mass Role Creation Tool Using Abap m8


    Hi All, I got a requirement to automate the mass role creation and updation. I need to know what are the BAPI's used for role creation, modification and tables that are related to role. if you have any idea about automation of mass role creation please suggest me .Thanks,Vijayguru Kumar.

    DB:2.84:Mass Role Creation Tool Using Abap m8

    You are not really lucky .. in the same page of SDN .. Mass role change using excel file without using PFCG.the key word of what you need is : MASS PFCG regardsFred

  • RELEVANCY SCORE 2.84

    DB:2.84:Examples For Cutover Activities k8



    hi

    can any me tell me what are the cutover activities and example for this

    kumar

    DB:2.84:Examples For Cutover Activities k8


    Cutover Activities or Master Data Uploading Strategies Depending upon the when we are going live. As per that, you have to give the information to your core team. If you goling live at the middle you have to upload the all PL Account items and B/S Items. If you going live at the financial year start, you have to only Upload the B/S Items. Activities for Golive:

    1. G/L Master Upload Thru BDC or LSMW (TC-Fs00 and extended one co code to another company code Fs01)

    2. Vendor Master Upload Thru BDC Or LSMW (Will be Taken Care By MM)

    3. Customer Master Upload Thru BDC or LSMW (Will be Taken Care By SD)

    4. Asset Master Upload(Thru As90)

    5. Cost Element Master Upload

    6. Cost Center Master Upload

    7. Profit Center Master Upload

    8. G/L Balances Thru F-02

    10. Vendor Balances thru F-43

    11. Customer Balances thru F-22

    12. Customer Advances thru f-29

    13. Vendor Advances thryu F-48

  • RELEVANCY SCORE 2.75

    DB:2.75:What Is Cutover Activities Of Sap Ps In Mfg Company? ja



    Hi guys,

    can any once let me know what is cutover activities of sap ps in mfg company and how can do these activities?

    BR//sanjeev

    DB:2.75:What Is Cutover Activities Of Sap Ps In Mfg Company? ja


    I am not getting what you exactly want to say here. By saying that we are not using MS Project, do you mean that you want to know about the cutover activites where Projects are not involved?

    Based on my assumptions on what you are saying, irrespective of whether you use MS Project or some other legacy system there are some basic cutover activities you need to do wherever Projects are involved. Those are listed in the posts above.

    In case you want to know about the cutover activities where projects are not involved it would be better to discuss with the business on what data should be uploaded in SAP as part of cutover activity.

    Hope its clear.

  • RELEVANCY SCORE 2.74

    DB:2.74:Cutover md



    Hi,

    Can we upload previous transactions ( Sales Order, Deliveries, Invoices etc...) during CutOver thru (LSMW,BDC....)?

    For that I heard there should be no Open order, open delivery or open billing, is that right?

    What is the standard duration for CutOver?

    Thank You,

    Shastri

    DB:2.74:Cutover md


    If Sales Order is Open, we require to foreclose the Sales Order also ensure that there is no open deliveries. Incase if there is any open deliveries, they should either comple the process upto Billing creating accounting Document or the Deliveries should be cancelled. Similarly if there are any Billing document not passed to accounting, it should be ensured that they are passed to accounting.

    In the New System, if transaction are small in number then sales sales order should be created manually if the volume is high through LSMW.

    The Duration of Cut-Over is arounf 15 - 20 days ideally.

    Regards,

    Rajesh Banka

    Reward suitable points.

    How to give points: Mark your thread as a question while creating it. In the answers you get, you can assign the points by clicking on the stars to the left. You also get a point yourself for rewarding (one per thread).

  • RELEVANCY SCORE 2.73

    DB:2.73:Hr Abap Ess/Mss zk



    Hello Gurus,

    I am new to HR ABAP. Can any body give the idea of What is the ABAP'er role in ESS/MSS area. text removed

    Thanks

    Chakri

    Edited by: Matt on Nov 14, 2008 9:16 AM - Removed request for material

    DB:2.73:Hr Abap Ess/Mss zk


    Hi,

    Basically in HR ESS/MSS: Their role is to setupt the portal stuff in ESS/MSS. Also need some hands on Adobe Form. As some std Abobe Forms needs to be modified. Also need to trigger the customised Adobe forms from BADI in R/3.

    Thanks,

    Chidanand

  • RELEVANCY SCORE 2.72

    DB:2.72:Realisation Phase ! xm



    Dear SAP bwgurus,

    I know this might sound weird but I am in a situation where I am relatively new to BW and I have landed up in a job as a BW implementor.

    Currently we are in the Realisation phase and if someone can help me with basic steps in this PHASE..and what role should I be playing as I am all alone in this BW area.

    Kindly help

    REgards

    Bash

  • RELEVANCY SCORE 2.71

    DB:2.71:Regarding Cutover Strategy!!!! 7m



    what are the steps involved in the cut over stratey? please explain

    DB:2.71:Regarding Cutover Strategy!!!! 7m


    Hi Bhoopathy,

    Cut over strategy depends upon how the organizations design their data load strategies. Normally, you decide the sequence of Data loads for Configuration settings, Master data, Transaction data which follows whom and then you make a copy of the system as a Production system a day before and after checking the successful data loads, you go-live 100% or partial again depending upon organizational setup and policies.

    Cut over planning is highly site specific. There's no thumb rule. The stock data as on the date of going live should be correctly entered. But stock being a highly dynamic quantity, the strategy for loading should be crystal clear. Then you have to load all the back dated transaction on the stock. Some stock comes into your plant/storage location as return and some stock is actually delivered to your customer through sales orders of various kinds.

    Cutover Plan - The details of how to move to the production environment and go live. Ensuring that all master data to be loaded to production server is ready in correct format. User training is conducted user is in a comfort or atleast managable position to work on production server. Preparation of user manual. All go-live preparatory activities.

    cut over activities

    cut over planning

    Re: cut over strategy

    Follow the Links For More Info..

    Reward If Helpfull

    Regards..

    Praveen Kumar.D

  • RELEVANCY SCORE 2.71

    DB:2.71:Cutover Stratergy m8



    Hi all,

    I want to know that what are the activities will do in cutover plan and cutover stratergy for sd module.

    Thanks and regards

    kesav

    DB:2.71:Cutover Stratergy m8


    Hi all

    My issue has been solved.

    Thank you

  • RELEVANCY SCORE 2.71

    DB:2.71:Cutover Pr Po 38



    1.In our legacy system we donot have any Acct.Assingment field. in PR/PO ,how we should take care will uploading of cutover data

    2. Which PR should i take whether all approved ,or pendings also

    3.what about PO

    rEGARDS

    SAM

    DB:2.71:Cutover Pr Po 38


    Hi,

    1.In legassy system if there are no consumption PO's you can upload the PR/PO's in SAP as stock one's only.

    2.It depends on the company requirement.If company wants the history records of PR's and PO's in SAP from perticular date onwards then you need to load all the PR's and PO's from that date.Or if the company wants only PR's or PO's which are open only then you have to load the PR's or PO's for open quantities (even partial quantities) only.

    3.In case of PO's if want the total history of the PO's that you are loading (i.e.GR's done against the PO's and invoices verified against the PO's) then you need to load the PO's for the total quantities. And up load the GR's and invoices against the PO's.

    Regards,

    Rambhupal reddy

  • RELEVANCY SCORE 2.71

    DB:2.71:What Is Cutover And Mock Cutover? 79



    HI experts,

    Could you explain what cutover and mock cutover mean?

    Thanks a bunch,

    JEss..

    DB:2.71:What Is Cutover And Mock Cutover? 79


    HI experts,

    Could you explain what cutover and mock cutover mean?

    Thanks a bunch,

    JEss..

  • RELEVANCY SCORE 2.71

    DB:2.71:Cutover Date ks



    what is the cutover date

    DB:2.71:Cutover Date ks


    Hai

    PLs close the thread if ur issue is resolved......

    Manohar

  • RELEVANCY SCORE 2.71

    DB:2.71:Role Of Abap-Hr Technical Person In Hr Support Pack Upgrade. s7



    Can anyone tell me, What is the role of ABAP-HR Technical person in HR Support pack upgrade.What he needs to moniter during the upgrade.

    DB:2.71:Role Of Abap-Hr Technical Person In Hr Support Pack Upgrade. s7


    Can anyone tell me, What is the role of ABAP-HR Technical person in HR Support pack upgrade.What he needs to moniter during the upgrade.

  • RELEVANCY SCORE 2.71

    DB:2.71:Regarding Crystal Reports 1m



    Hi,

    Can I getter a better idea about what are crystal reports and role of ABAPer in this,

    are they related to ABAP and how?

    Regards,

    Pavan.

    DB:2.71:Regarding Crystal Reports 1m


    Hi Pavan,

    Well not much of a help... I guess its a new product ... Along with LUMIRA

    It's more of a BI kind of tool much of Config... so I am not sure if anything directly for ABAPers

    You can get some info on the sap site though here is the link

    http://www.crystalreports.com/whitepapers/brochures-whitepapers.asp

    Regards

  • RELEVANCY SCORE 2.69

    DB:2.69:Ac Erm : Role Creation And How To Delete Ungenerated Roles da



    Hi,

    When you work on a role from ERM, the role is created in the back end. It will be generated only at the generation phase. But what if finaly it is decided not to generate the role, is there a way to delete the role in the BE from ERM?

    It seems the only way is to go in PFCG and delete the role manualy?

    Regards

    DB:2.69:Ac Erm : Role Creation And How To Delete Ungenerated Roles da


    Hello Vincent,

    There are different tables in which the roles for RE (in frontend RE, frontend tables) and where the roles in R/3 are stored. That is, it might be that even if you are generating all the roles from RE, at a particular time the list of roles in RE is greater than number of roles in R/3 Backend. This is because:

    RE roles = Generated roles (which exist at backend as well)+Ungenerated roles (which are in RE only till that particular time).

    Here ungenerated roles would mean the roles which you have not yet generated in RE.

    Thus, __deleting roles from R/3 and RE are two separate things__.

    1. To achieve the deletion the role from Backend (R/3) you should create a request in RE to remove this role from all the users currently attached to it as there is no way possible to delete the role from R/3 by creating a request from RE. Doing this would still have the role in R/3 but with no user assigned.

    2. To delete the role from RE tables, so that you do not see it again, you can Search for the role, select it and then click on the "Delete" TAB. This will delete the role from the RE tables.

    Now, for the clenliness of your R/3 system, in case you do not want to see these roles in R/3 too, you can schedule a BG job to delete this or do a mass delete of all these roles say every fortnight or at whatever frequency as desired by your management.

    Regards,

    Hersh.

  • RELEVANCY SCORE 2.69

    DB:2.69:Pfcg Role And Launch Pad Role Issue j9



    Hi,

    I have doubt in PFCG Role and launch pad Role

    Let me know what is difference if you use PFCG role and launch role .I hope both are WD ABAP component role

    please let me know what are the cases we need to use PFCG role and what are the cases we need to use Launch pad role

    Regards,

    Prasad

    DB:2.69:Pfcg Role And Launch Pad Role Issue j9


    Hi Prasad,

    it depends on whether you use NWBC or an En

    terprise Portal, this is the main question.

    If you use NWBC you need the PFCG Roles for Authorizations AND for UI Visualization.If you use Enterprise Portal you need the PFCG Role for Authorizations, the Launchpad for UI Visualization Input and a Portal Role with an iView that points to the Application HRESS_A_MENU to process the UI-Tree-Input provided by the Launchpad for rendering.

    In fact, now that I read my own post, I'm pretty much saying the same things as in Sagar Joshi's Blog that Sagar Gadre pointed you to....so I'm unsure whether I understood what is unclear for you..

    Cheers, Lukas

  • RELEVANCY SCORE 2.68

    DB:2.68:What Is Role Of Abap Developer In Sap Ui5 Application Development? dz



    Hi all,

    As a ABAP developer i would like to know what is role of abap developer in ui5 application development.? I know developing basic html website development using jquery also used phonegap build to deploy basic android app.What else skills i need to upgrade my skill set?

    Thanks

    Deepan Ignaatious

    DB:2.68:What Is Role Of Abap Developer In Sap Ui5 Application Development? dz


    Thanks Rakshit,

    What about say example i want to transform few parts of existing PP module in erp to SAPUi5 by designing nice UI. So now this involves on click of button to call for bapi's for order creations etc.Does this have to be done in java or abap is still required for calling the FM.

    How are fields retrieved from sap table via rfc mapped and binded to screen?

  • RELEVANCY SCORE 2.68

    DB:2.68:Cutover Activities And Cutover Data 97


    Hi ,Can anybody pl. tell me what is cutover strategy or cutover activities? What are cutover data is there?Is there any specific activity in ppRegards

  • RELEVANCY SCORE 2.66

    DB:2.66:Distribution Channel p1



    Can anybody provide me a detailed document on Distribution Channel. (What is the use of it. What is the role of an abap developer in it. What is the procedure involved init?)

    DB:2.66:Distribution Channel p1


    Hi,

    In SD Module, Sales Orgn(VKORG), Distribution Channel(VTWEG) and Division(SPART) are the Three higer level Orgn Units which together treated as SALES AREA.

    Generally when ever you are creating Reports w.r.t to SD module these 3 fields will be on selection screen and data will be fetched based on these three fields.

    Master tables for: is VKORG(SALES Orgn) is TVKO and for VTWEG(Dist Channel) TVTW and for SPARt(division) is TSPA.

    Most of all Header related Transaction tables in SD cycle (VBAK,LIKP,VBRK,VTTK etc) consists of these three fields and when ever you are fetching data from these related transactions, you have to consider these fields in the header tables.

    Hope this helps you to understand a lot.

    Regards,

    Anji

    Message was edited by:

    Anji Reddy Vangala

  • RELEVANCY SCORE 2.65

    DB:2.65:Cutover Activities In Controlling pz



    Hi,

    Could anyone tell me what are the cutover activities in controlling.

    Regards,

    Amit Kumar

    DB:2.65:Cutover Activities In Controlling pz


    Amit,

    you may check below items for example:

    Cost Center Reports

    Profitability Analysis - consolidation

    Drawback cost calculation

    Stock valuation on Commercial

    Cost object time confirmations

    Fixed and Variable cost

    Materials used in production but not in BOM

    Distribution channels

    Buy for reasale

    Promotions scenarios

    Production orders on commercial

    Keep in your mind each SAP installations have particulaties and you have to check it with your key user.

    regards

  • RELEVANCY SCORE 2.64

    DB:2.64:New Role To Be Called In Ecc 87



    I am on ECC 6 Webdynpro ABAP (EHP 5) and EP 7. I have to create a new role "Team Lead" ( ESS MSS is in place) . I have created role in EP and its reflecting in EP. What is the procedure to call the role in ECC.

    Thanks

    Edited by: king vs on Feb 10, 2012 7:31 AM

    DB:2.64:New Role To Be Called In Ecc 87


    What is the use of Manager ADD ON. pls throw some light

  • RELEVANCY SCORE 2.63

    DB:2.63:Cutover Activities 33



    Hi experts

    what is cut over activities which phase we r doing cut over activities

    can any body explain in detailed way

    thanks in advance

    srikanth

    DB:2.63:Cutover Activities 33


    Hi,

    As per your query you have to go as pe SAP upgrade document where you will find all the points to be check step by step like mentioned in other blogers. I hope you are clear now.

    Anil

  • RELEVANCY SCORE 2.60

    DB:2.60:Cutover Statergy zs



    Hi,

    What is the tool that is used in Cutover statergy?

    Thanks,

    DB:2.60:Cutover Statergy zs


    Hi Dublin,

    You anwe has beeb very helfpul .

    Is any tood used?

    Thanks,

  • RELEVANCY SCORE 2.60

    DB:2.60:Piappluser User - No Abap Sld To Add To... cp



    In the installation guide, in the section 'Performing PI-Specific Steps for SLD Configuration', it says:

    bFor a central SLD, the user PIAPPLUSER must be created in the central SLD ABAP system first and be assigned to ABAP role SAP_XI_APPL_SERV_USER./b

    However our SLD is all JAVA based and does not have an ABAP stack associated with it. What do I do?

    Thanks.

    Paul

    DB:2.60:Piappluser User - No Abap Sld To Add To... cp


    I am using a central SLD which is sitting on a JAVA only stack (which is also used as a SAP WebDynpro server). This works okay as an SLD for all of our other systems (e.g. R/3, BW, HR, Portal, etc.).

    In transaction SLDAPICUST on the PI ABAP system, I can see a valid connection to the SLD server (and from the SLD server I can see that the PI server is registered). However this connection uses the username SLDAPIUSER, not PIAPPLUSER.

    The instructions say that once the PIAPPLUSER is defined on the ABAP stack of the SLD server, I then need to go to transaction SLDAPICUST and replace the user SLDAPIUSER with PIAPPLUSER.

  • RELEVANCY SCORE 2.60

    DB:2.60:What Are Cutover Activities? c3


    Dear Experts,What are the cutover activities to be done in sap hr.The client is implementing PA,OM,Positive TM ,ESS MSS.Request you to provide information in detail,as how do I perform cutover activities step by step.Thanks Regards,

    DB:2.60:What Are Cutover Activities? c3

    Dear SAP,Yes you can upload also don't think LSMW is different thing this is nothing but Just mass uploading for master data.For LSMW steps below is the linkLSMW for Functional Consultants in simple step-by-step wayUr's Mohan

  • RELEVANCY SCORE 2.59

    DB:2.59:Project Related Questions............... 1f



    Hi All,

    I have couple of Questions.... Please help me out ...

    1.What is a cutover plan or cutover startergy...? which phase of the project it comes into picture?

    2.What is steering committee.... ?

    3.What is KPI( Key performance indicators)......

    4.What is a Rollout project.. What is the difference between the rollout project and step by step implementation?

    Thanks in advance.....

    DB:2.59:Project Related Questions............... 1f


    1.What is a cutover plan or cutover startergy...? which phase of the project it comes into picture?

    Answer: Cutover Strategy or Cutover Plan is the activity done in ASAP methodology,While transfering the data from the Legacy System to the SAP System. At this point of time the billing will be stopped,all the open orders, contracts, pricing data will be transfered as per the cutover plan which is provided by the implementation partner.

    What ever you want to do on the system you need to do before or after this activity.

    This activity will be done in Final Preparation Phase, that means to stop the DEV Systems and QAS Systems. It is ready to run in PRD System. (Cut over to production)

    2.What is steering committee.... ?

    Answer: Selected members from Client side and Implementors Side will be formed as committee known as Steering Committee.

    And this committee sets agendas and schedules of business and Implementation of SAP.

    3.What is KPI( Key performance indicators)......

    Answer: Before starting of the SAP Implementation, Steering Committee will Identify some KPIs and they will concentrate more time on these KPIs.

    4.What is a Rollout project.. What is the difference between the rollout project and step by step implementation?

    Answer: Step by Step implementation means Implementation of SAP in an client from scratch.and Rollout Project means, implement the same settings in another company code of the same client.

    As per my knowledge, may be these are useful answers to all your above questions.

    Thanks

    Chandra

  • RELEVANCY SCORE 2.59

    DB:2.59:Role Of Abap Hr Consultant 1m



    Hello,

    Good Morning,

    some body explain the role of ABAP HR Guy (Roles and Responsibilities).

    Regards,

    Usha.

    DB:2.59:Role Of Abap Hr Consultant 1m


    Hi Sony

    Role : It's role are same as ABAPer like Reports , BDCs , enhancements, all the topic related to ABAP now only difference is

    1) As ABAP-HR person you must have to go through the little knowledge of clusters , how to fetch report from clusters? , Macros , LDBs etc...

    You are trainee in which company then they will teach what is required and with all the basics of ABAP HR and stress on the part where your role is required ex reports or BDC etc.

    All the best for future.

    Manoj Shakya

  • RELEVANCY SCORE 2.58

    DB:2.58:How To Run Depreciation For Asset Data Upload In Two Different Cutover Date 99


    Hello,There are 9 units in which for the 4 units Asset cutover date is 31.03.2012 and for other units its 05.06.2012Due to this please clarify my following points:1. For the same company code, can it be possible or not...2. If there is depreciation run in April and May,2012 for units whose cutover date is 31.03.2012 , how its going to affect the depreciation calculation for units whose cutover date is 05.06.20123. What will be the right strategy to resolve this matter?regards

    DB:2.58:How To Run Depreciation For Asset Data Upload In Two Different Cutover Date 99

    Why donot u Copy ur client to quality and upload data on 31/03/2012. and the follow all the steps suggested by Fernando Almeida.For data of 31/03/2012 Dep would Start from 01/04/2012/.and for data for 05/06/2012 data uploaded would contain Dep from 31/03/2012 till 04/06/2012 so no need to worry abt them Start date of Dep would be 05/06/2012 for SAP purpose.pls confirm me if it helps u

  • RELEVANCY SCORE 2.58

    DB:2.58:Cutover xz



    Hi,

    In my last interview i was asked how data was uploaded and was update till date to go live.. and when cutover strategy was implemented. Is it during realization phase.

    Thanks

    DB:2.58:Cutover xz


    hi

    the cut over plans will be taken into consideration in the business blue print process

    AS IS: here the client requirement are taken

    TO BE : the client requirement or process can be designed with help of a flow chart.

    here if we cannot map the process in SAP then we redetermine the process with different functionalities.

    the upload of the data will be done in the final preparation

    thanks and regrds

    K.GopalKrsihna

  • RELEVANCY SCORE 2.58

    DB:2.58:Cutover Activities c7



    What's involved during cutover? What are the activities that security has to do during cutover?

    Thanks in advance!

    DB:2.58:Cutover Activities c7


    Alex,

    Can you elaborate this one point?

    Check security config (screen variants, PRGN_CUST settings etc are in place)

    Thanks,

    Saga

  • RELEVANCY SCORE 2.58

    DB:2.58:Ecc 6.0 And Bi Authorizations In Project Implementation Phase For Dev Only xk



    I ) ECC 6.0 Authorizations for Project Team

    I have browsed through SDN and gone through several documents and perhaps trying to post our senario as clearly as possible for better answers

    Aim : 1) To give appropriate authorizations to

    a) Functional Consultants

    b) ABAP developers

    c) BI consultants

    in Development environment only on Customizing client,

    sandbox client and unit testing client

    There is no inhouse security consultant in house at this time.

    Type of Oragnization : Midsize

    project Life cycle phase : Bluprint-Realization

    Question1:

    What role and profile should I assign to functional consultants by preparing a role from the SAP standard role and what is the best way to restrict functional consultants from sensitive areas.

    eg: Modifying SAP_ALL option and assigning it to functional consultants.

    II.

    BI 7.0 Authorizations for BI consultants in Development environment

    Aim: 1) To give authorizations to BI 7.0 consultants (using only ABAP stack)

    Question: I have read through some forum and wiki answers in sdn and many explain that give SAP_ALL and SAP_NEW to BI consultants and in addition give 0bi_all, SAP_BW_DEVELOPER and much more.

    Can some body list what are the needed Roles for this kind of users ?

    I know in theory many talk, do not assign SAP_ALL, but the person who advice this never explained the best alternative, and none of them I know have practially told that they have not assigned SAP_ALL.

    Please explain . I think asnwering my question will bury many questions in this fourm .

    DB:2.58:Ecc 6.0 And Bi Authorizations In Project Implementation Phase For Dev Only xk


    Hi Nick,

    Did you get the answer? I'm lookinf for the same information about profiles.

    Thanks!!

  • RELEVANCY SCORE 2.58

    DB:2.58:Portal Roles Link To Abap Roles kj



    Hi,

    i want the user to get the roles that are assigned to him in the ABAP system. We have roles for specific functional area like MM, Sales Finance. I know if i create a portal roleand link the role to the abap role and set the prperty fo the role to be entry point i can get the roles as in the abap.

    What i want to achieve is some thing like this. The every user core role will have a BW Home and BW reports Tab by default in the level one. When the user selects BW Reports the level 2 should be filled with the abap roles assgined to him. Can any one help me if this can be achieved and if so the steps to be follow.

    Thank you,

    Ravi.

    DB:2.58:Portal Roles Link To Abap Roles kj


    Hi All,

    Done i managed to do it using the merge id in the properties of the roles.

    Thank you,

    Ravi.

  • RELEVANCY SCORE 2.58

    DB:2.58:Cut Over Period Or Cut Orver Planning 31



    hi friends

    what is cutover period and cut over planning . both r same . pls explain the briefly . when it is use the cutover period . what is the planning of cut over period

    regards

    shiva

    DB:2.58:Cut Over Period Or Cut Orver Planning 31


    Cut over means the transition steps from old legacy systems to the new SAP system. The cutover period is the fiscal period ( month/date) that you do the cut over. The cut over planning are the plans you create to achieve your cut over.

    pls assign points to say thanks.

  • RELEVANCY SCORE 2.58

    DB:2.58:Cutover Activities 9s



    hi all,

    what are all the CUTOVER activities to be followed while implementing SAP PM implenting in GOLIVE support phase

    regards,

    K.Thyagarajan

    DB:2.58:Cutover Activities 9s


    Cut Over Plans

    Detailed plans need to be developed for cutting over from the old system(s) to the new. Parallel runs of what will happen over the conversion period using test data, convert and watch for a period after wards to ensure nothing unexpected happens.

    http://www.sap-img.com/sap-implementation.htm

  • RELEVANCY SCORE 2.57

    DB:2.57:Regarding Ess And Mss f1



    Hi Experts,

    i'm basically abap/hr developer i'm want to know more about ESS and MSS, what is the abaper role in this portal based appliction plz help me to upgrade my self in portal side,

    i have also good knowledge on asp.net and abap/hr

    DB:2.57:Regarding Ess And Mss f1


    Hi,

    Isint this a wrong forum for that question..Just curious

  • RELEVANCY SCORE 2.57

    DB:2.57:Abap Consultants Demand Sap_All sk



    Hi,

    In oour company the ABAP developer is enjoying the privilage of SAP_ALL, now we want to chnage this and want to limit the accces. But the ABAP consultants are demanding for full access of all the Business Transactions for their daily work.

    I have proposed Snadard developer role along with few additional transaction.

    is it really needed to give the full access to ABAP consultants. please suggest. or what is the best way to build the security for ABAP consultants.

    Regards,

    Ram

    DB:2.57:Abap Consultants Demand Sap_All sk


    Hi

    If it's marked as standard without the possibility to change the node, it's because it's included in the Role Menu. In order to delete it, you need to locate it in the role menu, and delete it there.

    Regards

    Morten Nielsen

  • RELEVANCY SCORE 2.57

    DB:2.57:Performance Tunning as



    Sir,

    Like to know what is exactly role of ABAP consultant in Performance tunning and in what level they check the performance and should they debug program and if yes then in what ways.

    DB:2.57:Performance Tunning as


    Since all programs in SAP are executed on the application server, all ABAPers must kep in mind that everthing the write is using limted (and costly) precious resorces. It is imperative that all development be done with performance a major design consideration (even if volume is low today, may be high tomorrow and even if sytem resources are abundant today, may be low tomorrow)

    There is an abundance of performance tuning tips availaible, please search and use them for a healthy system.

    While developing new objects, abap developers should keep in mind the performance considerations in the design. While handling performance improvement tickets, developers are required to identify reasons for poor perfomance and optimize code. USe ST05, S30 for analysis. Doing SLIN wont hurt either, there are some things that it catches. (eg empty conditions, unused data)

    Hope thhis helps

  • RELEVANCY SCORE 2.56

    DB:2.56:Cutover Activities s1



    Hi SD Gurus,

    Can any one explain,what are the cutover activities and what is SD consultant role at that point.

    Regards,

    Gopi

    DB:2.56:Cutover Activities s1


    Dear Dear gopi uddanda,

    You have marked as answer but no rewar points ????

    Regards,

    Srikanthraj

  • RELEVANCY SCORE 2.56

    DB:2.56:Sap Abap Tester cz



    Hello Friends,

    Recently in got one requirement on SAP ABAP Tester. They didnt gave me any detailed explanation. what is role played by the abaper in this position? Can anyone have any documents relating to this...please post here.

    Thanks,

    DB:2.56:Sap Abap Tester cz


    role : test the programs with original data in quality system

  • RELEVANCY SCORE 2.56

    DB:2.56:Cutover Activities dx


    hi all,what are the CUTOVER activities that has to be taken while implementing SAP PM in golive support phaseregardsK.thyagarajan

    DB:2.56:Cutover Activities dx

    For the purpose of the cut over, it is desirable that there are no open orders as on the date of the stock taking. Thus, WIP shall be zero as on the cut off date. If the existence of WIP is unavoidable, then the materials consumed shall be treated as the materials of the previous stage and necessary adjustments shall be passed after the cut over date. This is one of the Cutover strategies. Hope this helps you.

  • RELEVANCY SCORE 2.56

    DB:2.56:Doubt mk


    Hai all, 1. What is the difference between configuration and customisation?2. What is cutover strategy?3. What is Legacy system.Kedar

    DB:2.56:Doubt mk

    HI , we had the client requirement for their exhbition *** sales ,for those kind of sales ,item wont be returned after it is delievered and billed . we can do this in cash sales process. we have created a new sales doc type(from copying standard CS),customized as the division in sales order should take always form material master record and divison should be same at both doc level and item level,bChek division should be - 2 Error,/b in item category - bZBVN(copiend from BVN) ,mark off " returns/b"- which meant i tz not relevant for the returns.no need to maintain Copy Control bet CS- RE.I hope itz bit clear.for that,

  • RELEVANCY SCORE 2.56

    DB:2.56:What Is Cutover Date And Cutover Activities p7



    Dear All,

    What is Cutover Date And Cutover activities, if nay one know kindly help me

    Regards

    Reddy.

    DB:2.56:What Is Cutover Date And Cutover Activities p7


    at the final preparation stage we have list of activitiesl ike

    1.all transport request moved to production?

    2.check all number ranges are there i production?

    3.check all user profile are working ?

    4.if problems will occure in production system , how we will deal /

    5.all master data uploaded in production server?

    like that only

    chandra

  • RELEVANCY SCORE 2.56

    DB:2.56:Cutover Data da



    Dear All

    What is cutover data ?,Can you please let me know what data needs to be collected for cutover activity

    If you have any sample templates,please forward to me

    ID: sameersangani@gmail.com

    Regards

    Sam

    DB:2.56:Cutover Data da


    All open data in legacy system such as the open PO's, Stocks of material's, assets, vendor and customer opening line items, excise balances etc.

  • RELEVANCY SCORE 2.55

    DB:2.55:Upload Of Expenses And Revenues In Trail Balance x7



    Hi,

    We are in the cutover phase now and how we ulpoad the expense sand revenues in trail balance becz my client is insisting on this and while I doing the same the system is asking the cost object for the same how we will give this which does not exist in legacy.

    What is the best practice on the revenues and expenses upload in SAP.

    Can we use SAP cost centers and upload or we can use dummy cost centers for this purpose and block later on ?

    DB:2.55:Upload Of Expenses And Revenues In Trail Balance x7


    Hi,

    Siva How are you???

    Take one Cost center for Initial uploading with the Go-Live date time frame (that means for one day) and upload all the PL Accounts. After completion of uploading Lock the Cost center in control data tab. Just like you are creating Initial uploading GL's.

    All the best,

    Dharma Rao. Yekula.

  • RELEVANCY SCORE 2.54

    DB:2.54:Stock Assessment 39



    Hi ALL,

    What is Stock assessment, wher can we use it, what is the role of ABAP

    Thanks regds,

    srinivas.

    DB:2.54:Stock Assessment 39


    Hi ALL,

    What is Stock assessment, wher can we use it, what is the role of ABAP

    Thanks regds,

    srinivas.

  • RELEVANCY SCORE 2.52

    DB:2.52:All Display Authorization To Basis, Abap Spro sz



    Dear Experts,

    I am supposed to give only the display authorization to BASIS, ABAP SPRO tcodes to the functional consultants.(in ECC 5.0, ECC 6.0 and R/3 4.7)

    If you have any such role or what are all objects and respective activity.

    Please kindly help in this regards

    Regards,

    Kishore

    DB:2.52:All Display Authorization To Basis, Abap Spro sz


    Dear friend

    What you can do you have to create a SAP_ALL role and you can restrict by authorization object

    shailesh

  • RELEVANCY SCORE 2.52

    DB:2.52:Sending Cache Notifications To The Backend Abap zp



    Hi,

    1. How the cache notifications are sent to the backend ABAP?

    2. What is the role of INTEGRATION_DIRECTORY_HMI ( /dir/CacheRefresh )?

    3. If I need to require cache notifications to be sent from PI (ABAP 7.1) to ECC (ABAP 7.0), do i need to have INTEGRATION_DIRECTORY_HMI in ECC?

    Thanks and regards,

    Sreehari

    DB:2.52:Sending Cache Notifications To The Backend Abap zp


    Hi Abhishek,

    Just want to be clear about one thing. If INTEGRATION_DIRECTORY_HMI stores the cache updates, and I need to send these updates to ECC ( which is on a seperate AS ), ideally I should be having the RFC destination in ECC as well.

    My understanding was if the RFC destination exist in PI, it will send cache notifications to the ABAP of PI. If we need to send cache notifications to some other ABAP system in the landscape, we need to have the RFC destination there as well. Please correct me if I am wrong.

    Many Thanks and regards,

    Sreehari

  • RELEVANCY SCORE 2.52

    DB:2.52:Scm5.0 To Scm7.0ehp1 Upgrade 8d



    Hi,

    We are upgrading SCM5.0 ABAP+JAVA system to SCM7.0EhP1.

    As per guide we started ABAP using SAPUP and trying JAVA using EHPI . We

    in PREPROCESSING

    phase of ABAP upgradebut and its is waiting in phase MAIN_SHDIMP/GETSYNC_PREUP_FINI_D for JAVA to be sync.

    But we are unable to upgrade JAVA using EHPI. When we tried to launch EHPI parallel with SAPUP its giving message as "ROLE CHANGED TO OBSERVER"

    We also tried ABAP+JAVA upgrade using EHPI but for ABAP its not detecting UPGRADE DVDs. It is detecting only XML files.

    Attached are logs and screenshots of upgrade.

    Please help us to upgrade JAVA

    Thanks Regards,

    Kunal Kulkarni

    DB:2.52:Scm5.0 To Scm7.0ehp1 Upgrade 8d


    Can you tell me which SAP note / doc are you referring to which mentions the above.

    Regards

    Ratnajit

  • RELEVANCY SCORE 2.52

    DB:2.52:Data Migration Cutover Plan d7


    Hi please help on how to create cutover plan for data migration, and what are the tasks and what are the activeites , if any one having please send the cutover plan.

    DB:2.52:Data Migration Cutover Plan d7

    Hi please help on how to create cutover plan for data migration, and what are the tasks and what are the activeites , if any one having please send the cutover plan.

  • RELEVANCY SCORE 2.51

    DB:2.51:Stock Assessment xm



    Hi ALL,

    What is Stock assessment, wher can we use it, what is the role of ABAP

    Thanksregds,

    srinivas.

    DB:2.51:Stock Assessment xm


    Hi ALL,

    What is Stock assessment, wher can we use it, what is the role of ABAP

    Thanksregds,

    srinivas.

  • RELEVANCY SCORE 2.51

    DB:2.51:Ides Ecc 6.0 Installation Error 9z



    Hello, i m installing ides ecc 6.0 on win2k3 server. Database is Oracle 10g. JAVA version is j2sdk1.4.3.13

    i m getting the error while installing d/b instance in ABAP IMPORT phase (phase 17 of 20)

    it is showing some failed jobs

    what should i do to resolve this?

    DB:2.51:Ides Ecc 6.0 Installation Error 9z


    This is the result of file : import_monitor.log

    INFO: 2008-02-26 19:43:53

    Import Monitor is started.

    CONFIG: 2008-02-26 19:43:53

    Application options:

    dbCodepage=4103

    dbType=ORA

    extFiles=yes

    importDirs=G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1;G:\ecc6.0\IdesEcc6.0\Export\Export2\EXP2;G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3;G:\ecc6.0\IdesEcc6.0\Export\Export4\EXP4;G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5;G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP6;G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP7;G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP8;G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP9;G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP10;G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP11

    installDir=C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB

    jobNum=3

    loadArgs= -stop_on_error

    monitorTimeout=30

    orderBy=

    r3loadExe=D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe

    sapinst=

    trace=all

    tskFiles=yes

    CONFIG: 2008-02-26 19:43:53

    List of packages with table structure: 'SAP0000'.

    CONFIG: 2008-02-26 19:43:53

    List of packages with views: 'SAPVIEW'.

    TRACE: 2008-02-26 19:43:53 com.sap.inst.migmon.imp.ImportStandardTask preCreate

    Parse of 'C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL' template file is started.

    INFO: 2008-02-26 19:43:53 com.sap.inst.migmon.imp.ImportStandardTask preCreate

    Parse of 'C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL' template file is successfully completed.

    Primary key creation: after load.

    Index creation: after load.

    INFO: 2008-02-26 19:43:54

    Data codepage 4103 is determined using TOC file 'G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\AGR_HIERT.TOC' for package 'AGR_HIERT'.

    TRACE: 2008-02-26 19:43:54 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_9' import package is started.

    TRACE: 2008-02-26 19:43:54 com.sap.inst.migmon.LoadTask run

    Loading of 'DOKCLU' import package is started.

    TRACE: 2008-02-26 19:43:54 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_9' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export4\EXP4\DATA\SAPSSEXC_9.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_9.TSK ORA -l SAPSSEXC_9.log

    TRACE: 2008-02-26 19:43:54 com.sap.inst.migmon.LoadTask run

    Loading of 'PCL2' import package is started.

    TRACE: 2008-02-26 19:43:54 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'DOKCLU' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export2\EXP2\DATA\DOKCLU.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" DOKCLU.TSK ORA -l DOKCLU.log

    TRACE: 2008-02-26 19:43:54 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'PCL2' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export2\EXP2\DATA\PCL2.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" PCL2.TSK ORA -l PCL2.log

    TRACE: 2008-02-26 19:43:54 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'DOKCLU' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i DOKCLU.cmd -dbcodepage 4103 -l DOKCLU.log -stop_on_error

    TRACE: 2008-02-26 19:43:54 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_9' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_9.cmd -dbcodepage 4103 -l SAPSSEXC_9.log -stop_on_error

    TRACE: 2008-02-26 19:43:54 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'PCL2' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i PCL2.cmd -dbcodepage 4103 -l PCL2.log -stop_on_error

    INFO: 2008-02-26 21:16:12 com.sap.inst.migmon.LoadTask run

    Loading of 'PCL2' import package is successfully completed.

    TRACE: 2008-02-26 21:16:32 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_8' import package is started.

    TRACE: 2008-02-26 21:16:32 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_8' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_8.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_8.TSK ORA -l SAPAPPL1_8.log

    TRACE: 2008-02-26 21:16:43 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_8' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_8.cmd -dbcodepage 4103 -l SAPAPPL1_8.log -stop_on_error

    INFO: 2008-02-26 22:04:25 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_8' import package is successfully completed.

    TRACE: 2008-02-26 22:04:32 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPCLUST' import package is started.

    TRACE: 2008-02-26 22:04:33 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPCLUST' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPCLUST.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPCLUST.TSK ORA -l SAPCLUST.log

    TRACE: 2008-02-26 22:04:44 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPCLUST' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPCLUST.cmd -dbcodepage 4103 -l SAPCLUST.log -stop_on_error

    INFO: 2008-02-26 22:10:17 com.sap.inst.migmon.LoadTask run

    Loading of 'DOKCLU' import package is successfully completed.

    TRACE: 2008-02-26 22:10:33 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_10' import package is started.

    TRACE: 2008-02-26 22:10:33 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_10' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_10.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_10.TSK ORA -l SAPAPPL1_10.log

    TRACE: 2008-02-26 22:10:33 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_10' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_10.cmd -dbcodepage 4103 -l SAPAPPL1_10.log -stop_on_error

    INFO: 2008-02-26 22:52:13 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPCLUST' import package is successfully completed.

    TRACE: 2008-02-26 22:52:33 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_7' import package is started.

    TRACE: 2008-02-26 22:52:34 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_7' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSSEXC_7.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_7.TSK ORA -l SAPSSEXC_7.log

    TRACE: 2008-02-26 22:52:38 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_7' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_7.cmd -dbcodepage 4103 -l SAPSSEXC_7.log -stop_on_error

    INFO: 2008-02-26 22:56:46 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_10' import package is successfully completed.

    TRACE: 2008-02-26 22:57:04 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSDIC_2' import package is started.

    TRACE: 2008-02-26 22:57:04 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSDIC_2' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSDIC_2.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSDIC_2.TSK ORA -l SAPSDIC_2.log

    TRACE: 2008-02-26 22:57:04 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSDIC_2' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSDIC_2.cmd -dbcodepage 4103 -l SAPSDIC_2.log -stop_on_error

    INFO: 2008-02-26 23:47:54 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSDIC_2' import package is successfully completed.

    TRACE: 2008-02-26 23:48:05 com.sap.inst.migmon.LoadTask run

    Loading of 'REPOTEXT' import package is started.

    TRACE: 2008-02-26 23:48:05 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'REPOTEXT' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\REPOTEXT.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" REPOTEXT.TSK ORA -l REPOTEXT.log

    TRACE: 2008-02-26 23:48:16 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'REPOTEXT' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i REPOTEXT.cmd -dbcodepage 4103 -l REPOTEXT.log -stop_on_error

    INFO: 2008-02-27 01:32:13 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_9' import package is successfully completed.

    TRACE: 2008-02-27 01:32:37 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_13' import package is started.

    TRACE: 2008-02-27 01:32:37 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_13' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_13.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_13.TSK ORA -l SAPAPPL1_13.log

    TRACE: 2008-02-27 01:32:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_13' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_13.cmd -dbcodepage 4103 -l SAPAPPL1_13.log -stop_on_error

    INFO: 2008-02-27 02:07:14 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_13' import package is successfully completed.

    TRACE: 2008-02-27 02:07:37 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_7' import package is started.

    TRACE: 2008-02-27 02:07:38 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_7' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_7.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_7.TSK ORA -l SAPAPPL1_7.log

    TRACE: 2008-02-27 02:07:39 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_7' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_7.cmd -dbcodepage 4103 -l SAPAPPL1_7.log -stop_on_error

    INFO: 2008-02-27 04:34:57 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_7' import package is successfully completed.

    TRACE: 2008-02-27 04:35:10 com.sap.inst.migmon.LoadTask run

    Loading of 'RSMPTEXTS' import package is started.

    TRACE: 2008-02-27 04:35:10 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'RSMPTEXTS' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\RSMPTEXTS.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" RSMPTEXTS.TSK ORA -l RSMPTEXTS.log

    TRACE: 2008-02-27 04:35:11 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'RSMPTEXTS' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i RSMPTEXTS.cmd -dbcodepage 4103 -l RSMPTEXTS.log -stop_on_error

    INFO: 2008-02-27 04:45:34 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_7' import package is successfully completed.

    TRACE: 2008-02-27 04:45:40 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_9' import package is started.

    TRACE: 2008-02-27 04:45:41 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_9' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_9.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_9.TSK ORA -l SAPAPPL1_9.log

    TRACE: 2008-02-27 04:45:43 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_9' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_9.cmd -dbcodepage 4103 -l SAPAPPL1_9.log -stop_on_error

    INFO: 2008-02-27 04:48:32 com.sap.inst.migmon.LoadTask run

    Loading of 'REPOTEXT' import package is successfully completed.

    TRACE: 2008-02-27 04:48:40 com.sap.inst.migmon.LoadTask run

    Loading of 'D010TAB' import package is started.

    TRACE: 2008-02-27 04:48:40 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'D010TAB' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\D010TAB.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" D010TAB.TSK ORA -l D010TAB.log

    TRACE: 2008-02-27 04:48:41 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'D010TAB' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i D010TAB.cmd -dbcodepage 4103 -l D010TAB.log -stop_on_error

    INFO: 2008-02-27 05:58:08 com.sap.inst.migmon.LoadTask run

    Loading of 'RSMPTEXTS' import package is successfully completed.

    TRACE: 2008-02-27 05:58:11 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSDIC_3' import package is started.

    TRACE: 2008-02-27 05:58:11 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSDIC_3' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSDIC_3.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSDIC_3.TSK ORA -l SAPSDIC_3.log

    TRACE: 2008-02-27 05:58:12 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSDIC_3' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSDIC_3.cmd -dbcodepage 4103 -l SAPSDIC_3.log -stop_on_error

    INFO: 2008-02-27 06:14:46 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_9' import package is successfully completed.

    TRACE: 2008-02-27 06:15:11 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL2_2' import package is started.

    TRACE: 2008-02-27 06:15:11 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL2_2' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\SAPAPPL2_2.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL2_2.TSK ORA -l SAPAPPL2_2.log

    TRACE: 2008-02-27 06:15:13 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL2_2' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL2_2.cmd -dbcodepage 4103 -l SAPAPPL2_2.log -stop_on_error

    INFO: 2008-02-27 06:18:31 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSDIC_3' import package is successfully completed.

    TRACE: 2008-02-27 06:18:41 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_14' import package is started.

    TRACE: 2008-02-27 06:18:41 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_14' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_14.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_14.TSK ORA -l SAPAPPL1_14.log

    TRACE: 2008-02-27 06:18:42 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_14' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_14.cmd -dbcodepage 4103 -l SAPAPPL1_14.log -stop_on_error

    INFO: 2008-02-27 07:13:54 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_14' import package is successfully completed.

    TRACE: 2008-02-27 07:14:12 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_12' import package is started.

    TRACE: 2008-02-27 07:14:12 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_12' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export4\EXP4\DATA\SAPSSEXC_12.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_12.TSK ORA -l SAPSSEXC_12.log

    TRACE: 2008-02-27 07:14:12 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_12' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_12.cmd -dbcodepage 4103 -l SAPSSEXC_12.log -stop_on_error

    INFO: 2008-02-27 08:22:53 com.sap.inst.migmon.LoadTask run

    Loading of 'D010TAB' import package is successfully completed.

    TRACE: 2008-02-27 08:23:13 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_5' import package is started.

    TRACE: 2008-02-27 08:23:13 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_5' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSSEXC_5.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_5.TSK ORA -l SAPSSEXC_5.log

    TRACE: 2008-02-27 08:23:13 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_5' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_5.cmd -dbcodepage 4103 -l SAPSSEXC_5.log -stop_on_error

    INFO: 2008-02-27 08:29:20 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_12' import package is successfully completed.

    TRACE: 2008-02-27 08:29:43 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSLEXC' import package is started.

    TRACE: 2008-02-27 08:29:43 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSLEXC' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSLEXC.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSLEXC.TSK ORA -l SAPSLEXC.log

    TRACE: 2008-02-27 08:29:43 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSLEXC' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSLEXC.cmd -dbcodepage 4103 -l SAPSLEXC.log -stop_on_error

    INFO: 2008-02-27 09:00:57 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_5' import package is successfully completed.

    TRACE: 2008-02-27 09:01:13 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPNTAB' import package is started.

    TRACE: 2008-02-27 09:01:13 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPNTAB' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPNTAB.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPNTAB.TSK ORA -l SAPNTAB.log

    TRACE: 2008-02-27 09:01:14 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPNTAB' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPNTAB.cmd -dbcodepage 4103 -l SAPNTAB.log -stop_on_error

    INFO: 2008-02-27 09:09:05 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSLEXC' import package is successfully completed.

    TRACE: 2008-02-27 09:09:13 com.sap.inst.migmon.LoadTask run

    Loading of 'AGR_HIERT' import package is started.

    TRACE: 2008-02-27 09:09:13 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'AGR_HIERT' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\AGR_HIERT.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" AGR_HIERT.TSK ORA -l AGR_HIERT.log

    TRACE: 2008-02-27 09:09:13 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'AGR_HIERT' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i AGR_HIERT.cmd -dbcodepage 4103 -l AGR_HIERT.log -stop_on_error

    INFO: 2008-02-27 10:14:20 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL2_2' import package is successfully completed.

    TRACE: 2008-02-27 10:14:45 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL2_1' import package is started.

    TRACE: 2008-02-27 10:14:45 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL2_1' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL2_1.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL2_1.TSK ORA -l SAPAPPL2_1.log

    TRACE: 2008-02-27 10:14:47 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL2_1' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL2_1.cmd -dbcodepage 4103 -l SAPAPPL2_1.log -stop_on_error

    INFO: 2008-02-27 10:16:03 com.sap.inst.migmon.LoadTask run

    Loading of 'AGR_HIERT' import package is successfully completed.

    TRACE: 2008-02-27 10:16:15 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_2' import package is started.

    TRACE: 2008-02-27 10:16:15 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL0_2' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\SAPAPPL0_2.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL0_2.TSK ORA -l SAPAPPL0_2.log

    TRACE: 2008-02-27 10:16:16 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL0_2' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_2.cmd -dbcodepage 4103 -l SAPAPPL0_2.log -stop_on_error

    INFO: 2008-02-27 10:25:47 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPNTAB' import package is successfully completed.

    TRACE: 2008-02-27 10:26:15 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_1' import package is started.

    TRACE: 2008-02-27 10:26:15 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_1' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\SAPAPPL1_1.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_1.TSK ORA -l SAPAPPL1_1.log

    TRACE: 2008-02-27 10:26:16 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_1' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_1.cmd -dbcodepage 4103 -l SAPAPPL1_1.log -stop_on_error

    INFO: 2008-02-27 11:04:23 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_2' import package is successfully completed.

    TRACE: 2008-02-27 11:04:45 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_5' import package is started.

    TRACE: 2008-02-27 11:04:45 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_5' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_5.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_5.TSK ORA -l SAPAPPL1_5.log

    TRACE: 2008-02-27 11:04:47 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_5' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_5.cmd -dbcodepage 4103 -l SAPAPPL1_5.log -stop_on_error

    INFO: 2008-02-27 11:20:32 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_1' import package is successfully completed.

    TRACE: 2008-02-27 11:20:45 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_10' import package is started.

    TRACE: 2008-02-27 11:20:45 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_10' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\SAPSSEXC_10.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_10.TSK ORA -l SAPSSEXC_10.log

    TRACE: 2008-02-27 11:20:45 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_10' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_10.cmd -dbcodepage 4103 -l SAPSSEXC_10.log -stop_on_error

    INFO: 2008-02-27 11:42:08 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_5' import package is successfully completed.

    TRACE: 2008-02-27 11:42:16 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL2_4' import package is started.

    TRACE: 2008-02-27 11:42:16 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL2_4' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPAPPL2_4.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL2_4.TSK ORA -l SAPAPPL2_4.log

    TRACE: 2008-02-27 11:42:17 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL2_4' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL2_4.cmd -dbcodepage 4103 -l SAPAPPL2_4.log -stop_on_error

    INFO: 2008-02-27 11:59:37 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_10' import package is successfully completed.

    TRACE: 2008-02-27 11:59:46 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL2_6' import package is started.

    TRACE: 2008-02-27 11:59:46 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL2_6' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPAPPL2_6.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL2_6.TSK ORA -l SAPAPPL2_6.log

    TRACE: 2008-02-27 11:59:48 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL2_6' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL2_6.cmd -dbcodepage 4103 -l SAPAPPL2_6.log -stop_on_error

    INFO: 2008-02-27 12:12:19 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL2_1' import package is successfully completed.

    TRACE: 2008-02-27 12:12:46 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL2_5' import package is started.

    TRACE: 2008-02-27 12:12:46 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL2_5' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPAPPL2_5.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL2_5.TSK ORA -l SAPAPPL2_5.log

    TRACE: 2008-02-27 12:12:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL2_5' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL2_5.cmd -dbcodepage 4103 -l SAPAPPL2_5.log -stop_on_error

    INFO: 2008-02-27 12:41:36 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL2_4' import package is successfully completed.

    TRACE: 2008-02-27 12:41:46 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_7' import package is started.

    TRACE: 2008-02-27 12:41:46 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL0_7' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL0_7.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL0_7.TSK ORA -l SAPAPPL0_7.log

    TRACE: 2008-02-27 12:41:47 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL0_7' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_7.cmd -dbcodepage 4103 -l SAPAPPL0_7.log -stop_on_error

    INFO: 2008-02-27 13:16:34 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_7' import package is successfully completed.

    TRACE: 2008-02-27 13:16:47 com.sap.inst.migmon.LoadTask run

    Loading of 'E071K' import package is started.

    TRACE: 2008-02-27 13:16:47 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'E071K' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\E071K.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" E071K.TSK ORA -l E071K.log

    TRACE: 2008-02-27 13:16:47 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'E071K' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i E071K.cmd -dbcodepage 4103 -l E071K.log -stop_on_error

    INFO: 2008-02-27 13:34:13 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL2_6' import package is successfully completed.

    TRACE: 2008-02-27 13:34:17 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_4' import package is started.

    TRACE: 2008-02-27 13:34:17 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_4' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_4.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_4.TSK ORA -l SAPAPPL1_4.log

    TRACE: 2008-02-27 13:34:18 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_4' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_4.cmd -dbcodepage 4103 -l SAPAPPL1_4.log -stop_on_error

    INFO: 2008-02-27 14:03:35 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_4' import package is successfully completed.

    TRACE: 2008-02-27 14:03:47 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSRC' import package is started.

    TRACE: 2008-02-27 14:03:47 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSRC' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSSRC.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSRC.TSK ORA -l SAPSSRC.log

    TRACE: 2008-02-27 14:03:48 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSRC' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSRC.cmd -dbcodepage 4103 -l SAPSSRC.log -stop_on_error

    INFO: 2008-02-27 14:35:30 com.sap.inst.migmon.LoadTask run

    Loading of 'E071K' import package is successfully completed.

    TRACE: 2008-02-27 14:35:47 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_3' import package is started.

    TRACE: 2008-02-27 14:35:47 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_3' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSSEXC_3.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_3.TSK ORA -l SAPSSEXC_3.log

    TRACE: 2008-02-27 14:35:48 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_3' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_3.cmd -dbcodepage 4103 -l SAPSSEXC_3.log -stop_on_error

    INFO: 2008-02-27 14:36:09 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSRC' import package is successfully completed.

    TRACE: 2008-02-27 14:36:17 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL2_3' import package is started.

    TRACE: 2008-02-27 14:36:17 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL2_3' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPAPPL2_3.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL2_3.TSK ORA -l SAPAPPL2_3.log

    TRACE: 2008-02-27 14:36:19 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL2_3' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL2_3.cmd -dbcodepage 4103 -l SAPAPPL2_3.log -stop_on_error

    INFO: 2008-02-27 14:52:12 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_3' import package is successfully completed.

    TRACE: 2008-02-27 14:52:17 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_15' import package is started.

    TRACE: 2008-02-27 14:52:17 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_15' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_15.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_15.TSK ORA -l SAPAPPL1_15.log

    TRACE: 2008-02-27 14:52:19 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_15' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_15.cmd -dbcodepage 4103 -l SAPAPPL1_15.log -stop_on_error

    INFO: 2008-02-27 15:22:47 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL2_3' import package is successfully completed.

    TRACE: 2008-02-27 15:23:17 com.sap.inst.migmon.LoadTask run

    Loading of 'D021T' import package is started.

    TRACE: 2008-02-27 15:23:17 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'D021T' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\D021T.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" D021T.TSK ORA -l D021T.log

    TRACE: 2008-02-27 15:23:18 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'D021T' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i D021T.cmd -dbcodepage 4103 -l D021T.log -stop_on_error

    INFO: 2008-02-27 15:34:55 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_15' import package is successfully completed.

    TRACE: 2008-02-27 15:35:18 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_4' import package is started.

    TRACE: 2008-02-27 15:35:18 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_4' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSSEXC_4.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_4.TSK ORA -l SAPSSEXC_4.log

    TRACE: 2008-02-27 15:35:18 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_4' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_4.cmd -dbcodepage 4103 -l SAPSSEXC_4.log -stop_on_error

    INFO: 2008-02-27 15:35:44 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL2_5' import package is successfully completed.

    TRACE: 2008-02-27 15:35:48 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_12' import package is started.

    TRACE: 2008-02-27 15:35:48 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_12' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_12.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_12.TSK ORA -l SAPAPPL1_12.log

    TRACE: 2008-02-27 15:35:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_12' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_12.cmd -dbcodepage 4103 -l SAPAPPL1_12.log -stop_on_error

    INFO: 2008-02-27 15:46:10 com.sap.inst.migmon.LoadTask run

    Loading of 'D021T' import package is successfully completed.

    TRACE: 2008-02-27 15:46:18 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_9' import package is started.

    TRACE: 2008-02-27 15:46:18 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL0_9' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL0_9.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL0_9.TSK ORA -l SAPAPPL0_9.log

    TRACE: 2008-02-27 15:46:20 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL0_9' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_9.cmd -dbcodepage 4103 -l SAPAPPL0_9.log -stop_on_error

    ERROR: 2008-02-27 16:01:42 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_4' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_4.cmd -dbcodepage 4103 -l SAPSSEXC_4.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPSSEXC_4.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    ERROR: 2008-02-27 16:01:42 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_12' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_12.cmd -dbcodepage 4103 -l SAPAPPL1_12.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL1_12.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    ERROR: 2008-02-27 16:01:42 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_9' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_9.cmd -dbcodepage 4103 -l SAPAPPL0_9.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL0_9.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    TRACE: 2008-02-27 16:01:48 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_2' import package is started.

    TRACE: 2008-02-27 16:01:48 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_6' import package is started.

    TRACE: 2008-02-27 16:01:48 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_5' import package is started.

    TRACE: 2008-02-27 16:01:48 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL0_5' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\SAPAPPL0_5.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL0_5.TSK ORA -l SAPAPPL0_5.log

    TRACE: 2008-02-27 16:01:48 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_2' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSSEXC_2.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_2.TSK ORA -l SAPSSEXC_2.log

    TRACE: 2008-02-27 16:01:48 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_6' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSSEXC_6.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_6.TSK ORA -l SAPSSEXC_6.log

    TRACE: 2008-02-27 16:01:48 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_2' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_2.cmd -dbcodepage 4103 -l SAPSSEXC_2.log -stop_on_error

    TRACE: 2008-02-27 16:01:49 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_6' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_6.cmd -dbcodepage 4103 -l SAPSSEXC_6.log -stop_on_error

    TRACE: 2008-02-27 16:01:50 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL0_5' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_5.cmd -dbcodepage 4103 -l SAPAPPL0_5.log -stop_on_error

    INFO: 2008-02-27 16:25:48 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_6' import package is successfully completed.

    TRACE: 2008-02-27 16:26:18 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_6' import package is started.

    TRACE: 2008-02-27 16:26:18 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL0_6' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\SAPAPPL0_6.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL0_6.TSK ORA -l SAPAPPL0_6.log

    TRACE: 2008-02-27 16:26:21 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL0_6' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_6.cmd -dbcodepage 4103 -l SAPAPPL0_6.log -stop_on_error

    ERROR: 2008-02-27 17:02:10 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_5' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_5.cmd -dbcodepage 4103 -l SAPAPPL0_5.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL0_5.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    ERROR: 2008-02-27 17:02:11 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_6' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_6.cmd -dbcodepage 4103 -l SAPAPPL0_6.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL0_6.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    TRACE: 2008-02-27 17:02:19 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_1' import package is started.

    TRACE: 2008-02-27 17:02:19 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL0_1' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\SAPAPPL0_1.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL0_1.TSK ORA -l SAPAPPL0_1.log

    TRACE: 2008-02-27 17:02:19 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_8' import package is started.

    TRACE: 2008-02-27 17:02:19 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL0_8' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL0_8.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL0_8.TSK ORA -l SAPAPPL0_8.log

    TRACE: 2008-02-27 17:02:21 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL0_8' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_8.cmd -dbcodepage 4103 -l SAPAPPL0_8.log -stop_on_error

    TRACE: 2008-02-27 17:02:21 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL0_1' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_1.cmd -dbcodepage 4103 -l SAPAPPL0_1.log -stop_on_error

    INFO: 2008-02-27 17:23:54 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_2' import package is successfully completed.

    TRACE: 2008-02-27 17:24:19 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSDIC_1' import package is started.

    TRACE: 2008-02-27 17:24:19 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSDIC_1' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSDIC_1.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSDIC_1.TSK ORA -l SAPSDIC_1.log

    TRACE: 2008-02-27 17:24:19 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSDIC_1' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSDIC_1.cmd -dbcodepage 4103 -l SAPSDIC_1.log -stop_on_error

    INFO: 2008-02-27 17:50:52 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSDIC_1' import package is successfully completed.

    TRACE: 2008-02-27 17:51:19 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPPOOL' import package is started.

    TRACE: 2008-02-27 17:51:19 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPPOOL' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPPOOL.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPPOOL.TSK ORA -l SAPPOOL.log

    TRACE: 2008-02-27 17:51:20 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPPOOL' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPPOOL.cmd -dbcodepage 4103 -l SAPPOOL.log -stop_on_error

    ERROR: 2008-02-27 17:51:23 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_1' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_1.cmd -dbcodepage 4103 -l SAPAPPL0_1.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL0_1.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    ERROR: 2008-02-27 17:51:24 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_8' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_8.cmd -dbcodepage 4103 -l SAPAPPL0_8.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL0_8.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    TRACE: 2008-02-27 17:51:49 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_4' import package is started.

    TRACE: 2008-02-27 17:51:49 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_11' import package is started.

    TRACE: 2008-02-27 17:51:49 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_11' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_11.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_11.TSK ORA -l SAPAPPL1_11.log

    TRACE: 2008-02-27 17:51:49 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL0_4' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\SAPAPPL0_4.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL0_4.TSK ORA -l SAPAPPL0_4.log

    TRACE: 2008-02-27 17:51:50 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL0_4' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_4.cmd -dbcodepage 4103 -l SAPAPPL0_4.log -stop_on_error

    TRACE: 2008-02-27 17:51:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_11' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_11.cmd -dbcodepage 4103 -l SAPAPPL1_11.log -stop_on_error

    ERROR: 2008-02-27 18:02:26 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_4' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_4.cmd -dbcodepage 4103 -l SAPAPPL0_4.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL0_4.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    ERROR: 2008-02-27 18:02:26 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_11' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_11.cmd -dbcodepage 4103 -l SAPAPPL1_11.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL1_11.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    ERROR: 2008-02-27 18:02:26 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPPOOL' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPPOOL.cmd -dbcodepage 4103 -l SAPPOOL.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPPOOL.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    TRACE: 2008-02-27 18:02:50 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_11' import package is started.

    TRACE: 2008-02-27 18:02:50 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_8' import package is started.

    TRACE: 2008-02-27 18:02:50 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_2' import package is started.

    TRACE: 2008-02-27 18:02:50 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_11' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\SAPSSEXC_11.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_11.TSK ORA -l SAPSSEXC_11.log

    TRACE: 2008-02-27 18:02:50 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_8' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSSEXC_8.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_8.TSK ORA -l SAPSSEXC_8.log

    TRACE: 2008-02-27 18:02:50 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_2' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_2.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_2.TSK ORA -l SAPAPPL1_2.log

    TRACE: 2008-02-27 18:02:50 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_11' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_11.cmd -dbcodepage 4103 -l SAPSSEXC_11.log -stop_on_error

    TRACE: 2008-02-27 18:02:50 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_8' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_8.cmd -dbcodepage 4103 -l SAPSSEXC_8.log -stop_on_error

    TRACE: 2008-02-27 18:02:50 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_2' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_2.cmd -dbcodepage 4103 -l SAPAPPL1_2.log -stop_on_error

    ERROR: 2008-02-27 18:40:00 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_2' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_2.cmd -dbcodepage 4103 -l SAPAPPL1_2.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL1_2.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    TRACE: 2008-02-27 18:40:20 com.sap.inst.migmon.LoadTask run

    Loading of 'GLFUNCA' import package is started.

    TRACE: 2008-02-27 18:40:20 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'GLFUNCA' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\GLFUNCA.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" GLFUNCA.TSK ORA -l GLFUNCA.log

    TRACE: 2008-02-27 18:40:21 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'GLFUNCA' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i GLFUNCA.cmd -dbcodepage 4103 -l GLFUNCA.log -stop_on_error

    INFO: 2008-02-27 18:45:43 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_8' import package is successfully completed.

    TRACE: 2008-02-27 18:45:50 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_10' import package is started.

    TRACE: 2008-02-27 18:45:50 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL0_10' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL0_10.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL0_10.TSK ORA -l SAPAPPL0_10.log

    TRACE: 2008-02-27 18:45:53 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL0_10' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_10.cmd -dbcodepage 4103 -l SAPAPPL0_10.log -stop_on_error

    ERROR: 2008-02-27 18:45:55 com.sap.inst.migmon.LoadTask run

    Loading of 'GLFUNCA' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i GLFUNCA.cmd -dbcodepage 4103 -l GLFUNCA.log -stop_on_error' exited with return code 2.

    For mode details see 'GLFUNCA.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    TRACE: 2008-02-27 18:46:20 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_6' import package is started.

    TRACE: 2008-02-27 18:46:20 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_6' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_6.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_6.TSK ORA -l SAPAPPL1_6.log

    TRACE: 2008-02-27 18:46:21 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_6' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_6.cmd -dbcodepage 4103 -l SAPAPPL1_6.log -stop_on_error

    INFO: 2008-02-27 18:48:41 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_11' import package is successfully completed.

    TRACE: 2008-02-27 18:48:50 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_13' import package is started.

    TRACE: 2008-02-27 18:48:50 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_13' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export4\EXP4\DATA\SAPSSEXC_13.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_13.TSK ORA -l SAPSSEXC_13.log

    TRACE: 2008-02-27 18:48:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_13' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_13.cmd -dbcodepage 4103 -l SAPSSEXC_13.log -stop_on_error

    ERROR: 2008-02-27 18:53:37 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_6' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_6.cmd -dbcodepage 4103 -l SAPAPPL1_6.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL1_6.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    ERROR: 2008-02-27 18:53:37 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_10' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_10.cmd -dbcodepage 4103 -l SAPAPPL0_10.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL0_10.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    TRACE: 2008-02-27 18:53:50 com.sap.inst.migmon.LoadTask run

    Loading of 'SCPRSVALS' import package is started.

    TRACE: 2008-02-27 18:53:50 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SCPRSVALS' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SCPRSVALS.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SCPRSVALS.TSK ORA -l SCPRSVALS.log

    TRACE: 2008-02-27 18:53:50 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_3' import package is started.

    TRACE: 2008-02-27 18:53:51 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL1_3' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPAPPL1_3.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL1_3.TSK ORA -l SAPAPPL1_3.log

    TRACE: 2008-02-27 18:53:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SCPRSVALS' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SCPRSVALS.cmd -dbcodepage 4103 -l SCPRSVALS.log -stop_on_error

    TRACE: 2008-02-27 18:53:52 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL1_3' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_3.cmd -dbcodepage 4103 -l SAPAPPL1_3.log -stop_on_error

    ERROR: 2008-02-27 19:02:08 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL1_3' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL1_3.cmd -dbcodepage 4103 -l SAPAPPL1_3.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL1_3.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    TRACE: 2008-02-27 19:02:21 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_3' import package is started.

    TRACE: 2008-02-27 19:02:21 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPAPPL0_3' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\SAPAPPL0_3.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPAPPL0_3.TSK ORA -l SAPAPPL0_3.log

    TRACE: 2008-02-27 19:02:21 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPAPPL0_3' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_3.cmd -dbcodepage 4103 -l SAPAPPL0_3.log -stop_on_error

    ERROR: 2008-02-27 19:02:27 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPAPPL0_3' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPAPPL0_3.cmd -dbcodepage 4103 -l SAPAPPL0_3.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPAPPL0_3.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    ERROR: 2008-02-27 19:02:40 com.sap.inst.migmon.LoadTask run

    Loading of 'SCPRSVALS' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SCPRSVALS.cmd -dbcodepage 4103 -l SCPRSVALS.log -stop_on_error' exited with return code 2.

    For mode details see 'SCPRSVALS.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    TRACE: 2008-02-27 19:02:51 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSDOCU' import package is started.

    TRACE: 2008-02-27 19:02:51 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSDOCU' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export3\EXP3\DATA\SAPSDOCU.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSDOCU.TSK ORA -l SAPSDOCU.log

    TRACE: 2008-02-27 19:02:51 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSPROT' import package is started.

    TRACE: 2008-02-27 19:02:51 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSPROT' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSPROT.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSPROT.TSK ORA -l SAPSPROT.log

    TRACE: 2008-02-27 19:02:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSDOCU' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSDOCU.cmd -dbcodepage 4103 -l SAPSDOCU.log -stop_on_error

    TRACE: 2008-02-27 19:02:52 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSPROT' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSPROT.cmd -dbcodepage 4103 -l SAPSPROT.log -stop_on_error

    ERROR: 2008-02-27 19:03:03 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSPROT' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSPROT.cmd -dbcodepage 4103 -l SAPSPROT.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPSPROT.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    TRACE: 2008-02-27 19:03:21 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_1' import package is started.

    TRACE: 2008-02-27 19:03:21 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSSEXC_1' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSSEXC_1.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSSEXC_1.TSK ORA -l SAPSSEXC_1.log

    TRACE: 2008-02-27 19:03:21 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSSEXC_1' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_1.cmd -dbcodepage 4103 -l SAPSSEXC_1.log -stop_on_error

    ERROR: 2008-02-27 19:03:25 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSDOCU' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSDOCU.cmd -dbcodepage 4103 -l SAPSDOCU.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPSDOCU.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    TRACE: 2008-02-27 19:03:51 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSLOAD' import package is started.

    TRACE: 2008-02-27 19:03:51 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPSLOAD' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPSLOAD.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPSLOAD.TSK ORA -l SAPSLOAD.log

    TRACE: 2008-02-27 19:03:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPSLOAD' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSLOAD.cmd -dbcodepage 4103 -l SAPSLOAD.log -stop_on_error

    INFO: 2008-02-27 19:05:22 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSLOAD' import package is successfully completed.

    TRACE: 2008-02-27 19:05:51 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPUSER' import package is started.

    TRACE: 2008-02-27 19:05:51 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPUSER' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPUSER.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPUSER.TSK ORA -l SAPUSER.log

    TRACE: 2008-02-27 19:05:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPUSER' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPUSER.cmd -dbcodepage 4103 -l SAPUSER.log -stop_on_error

    INFO: 2008-02-27 19:06:32 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_1' import package is successfully completed.

    TRACE: 2008-02-27 19:06:51 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPDDIM' import package is started.

    TRACE: 2008-02-27 19:06:51 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPDDIM' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPDDIM.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPDDIM.TSK ORA -l SAPDDIM.log

    TRACE: 2008-02-27 19:06:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPDDIM' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPDDIM.cmd -dbcodepage 4103 -l SAPDDIM.log -stop_on_error

    INFO: 2008-02-27 19:07:01 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPDDIM' import package is successfully completed.

    TRACE: 2008-02-27 19:07:21 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPDFACT' import package is started.

    TRACE: 2008-02-27 19:07:21 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPDFACT' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPDFACT.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPDFACT.TSK ORA -l SAPDFACT.log

    TRACE: 2008-02-27 19:07:21 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPDFACT' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPDFACT.cmd -dbcodepage 4103 -l SAPDFACT.log -stop_on_error

    ERROR: 2008-02-27 19:07:23 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPSSEXC_13' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPSSEXC_13.cmd -dbcodepage 4103 -l SAPSSEXC_13.log -stop_on_error' exited with return code 2.

    For mode details see 'SAPSSEXC_13.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    INFO: 2008-02-27 19:07:24 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPDFACT' import package is successfully completed.

    INFO: 2008-02-27 19:07:37 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPUSER' import package is successfully completed.

    TRACE: 2008-02-27 19:07:51 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPDODS' import package is started.

    TRACE: 2008-02-27 19:07:51 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPUSER1' import package is started.

    TRACE: 2008-02-27 19:07:51 com.sap.inst.migmon.LoadTask run

    Loading of 'SAP0000' import package is started.

    TRACE: 2008-02-27 19:07:51 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPUSER1' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPUSER1.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPUSER1.TSK ORA -l SAPUSER1.log

    TRACE: 2008-02-27 19:07:51 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAPDODS' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export5\EXP5\DATA\SAPDODS.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAPDODS.TSK ORA -l SAPDODS.log

    TRACE: 2008-02-27 19:07:51 com.sap.inst.migmon.LoadTask processPackage

    Task file generation for 'SAP0000' import package:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -ctf I G:\ecc6.0\IdesEcc6.0\Export\Export1\EXP1\DATA\SAP0000.STR "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\DISTRIBUTED\AS-ABAP\DB\DDLORA.TPL" SAP0000.TSK ORA -l SAP0000.log -o D

    TRACE: 2008-02-27 19:07:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPUSER1' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPUSER1.cmd -dbcodepage 4103 -l SAPUSER1.log -stop_on_error

    TRACE: 2008-02-27 19:07:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAP0000' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAP0000.cmd -dbcodepage 4103 -l SAP0000.log -stop_on_error

    TRACE: 2008-02-27 19:07:51 com.sap.inst.migmon.LoadTask processPackage

    Loading of 'SAPDODS' import package into database:

    D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAPDODS.cmd -dbcodepage 4103 -l SAPDODS.log -stop_on_error

    ERROR: 2008-02-27 19:07:52 com.sap.inst.migmon.LoadTask run

    Loading of 'SAP0000' import package is interrupted with R3load error.

    Process 'D:\usr\sap\S60\SYS\exe\uc\NTI386\R3load.exe -i SAP0000.cmd -dbcodepage 4103 -l SAP0000.log -stop_on_error' exited with return code 2.

    For mode details see 'SAP0000.log' file.

    Standard error output:

    sapparam: sapargv( argc, argv) has not been called.

    sapparam(1c): No Profile used.

    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline

    INFO: 2008-02-27 19:07:53 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPUSER1' import package is successfully completed.

    INFO: 2008-02-27 19:07:53 com.sap.inst.migmon.LoadTask run

    Loading of 'SAPDODS' import package is successfully completed.

    WARNING: 2008-02-27 19:08:21

    Cannot start import of packages with views because not all import packages with tables are loaded successfully.

    WARNING: 2008-02-27 19:08:21

    21 error(s) during processing of packages.

    INFO: 2008-02-27 19:08:21

    Import Monitor is stopped.

  • RELEVANCY SCORE 2.51

    DB:2.51:Production Cutover mp



    what is this mean in BI.

    explain please.

    DB:2.51:Production Cutover mp


    Hi,

    pls Look at the thread below :

    Cut Over Activity

    Regards

    CSM Reddy

  • RELEVANCY SCORE 2.51

    DB:2.51:Error In Abap_Import Phase 8x


    Dear Guru's,We are facing some issue on ABAP Import phase, out of 29 Import Monior jobs 2 jobs gets failed.Error in Import_ABAP Phase, 2 jobs failedLoading of 'DD03L' import package: ERRORLoading of 'SACONT01' import package: ERRORcould anyone suggest me, what could be done to resolve this issue.regards,Guna

    DB:2.51:Error In Abap_Import Phase 8x

    HI,This seems to be media errorinvalid checksum in data file "/hm/cdmedia/solman7.0/51033518_Expor

  • RELEVANCY SCORE 2.50

    DB:2.50:Cutover Activities cf



    Dear experts,

    Can u tell me please what is the cutover activities in CO module ?

    How many templates r prepared(General case),Wt fields r they contain ?

    Plz tell

    Thanks,

    Sahoo

  • RELEVANCY SCORE 2.50

    DB:2.50:Provisioning Of Roles To Abap System Deletes Role Assignments In Backend 8d



    Hi all,

    following scenario:

    user has role A in an ABAP system which is connected to IDM. Assignment of role A to the user is not in the identity store.

    Now you assign role B via workflow to the user and IDM provisions this new assignment to the ABAP system.

    What will happen is that the user will get role B but assignment of role A will be deleted.

    This happens because in the job "SetABAPRoleProfileForUser" the connector attribute "roles" will only consist the role assignments which are in the identity store. All assignments in the ABAP system which are not yet in the IDS will be overwritten.

    This behaviour can be very critical. If you still allow role assignments directly in the backend system and you read these assignments e.g. once a day to the IDS - but in the meantime assignments have been done via workflow - you will lose data.

    My customer wants to assign roles both directly in the system and also by workflow. Every night an ABAP update job runs which writes new assignments to the IDS.

    Do you have any idea how I could solve this? Is there a way NOT to overwrite assignments with the ABAP connector field "roles"? I tried to use multivalue operator but this didn't do the trick.

    I hope I was able to describe my problem properly and you have answers...

    Best regards

    Jrn Kaplan

    DB:2.50:Provisioning Of Roles To Abap System Deletes Role Assignments In Backend 8d


    Hello Frank,

    thanks for your answer. As you can imagine this is not the answer I liked to hear.

    So I have to find a way that the user is always up to date before you try to assign a role through IDM.

    Do you know if it is possible to read specific users from the ABAP system with the ABAP connector. Can I filter which user I want to read? If yes I could read the user before I write the new assignment. I tried to set a Filter in the source parameters in the FromSAP pass but this somehow did not work.

    I have some other ideas to handle this issue but this would be one of the best solutions.

    Thanks and best regards

    Jrn Kaplan

  • RELEVANCY SCORE 2.50

    DB:2.50:Hi 9s



    Hi all,

    please let me know What is role of ABAPer , To initiate ABAP Proxy , Understaind of ABAP proxy With detailed Steps .

    Thanks ,

    Kumar

    DB:2.50:Hi 9s


    Thank u all , My question got all the Answers..

    Edited by: uday chikku on Apr 7, 2009 11:53 AM

    Edited by: uday chikku on Apr 7, 2009 11:54 AM

  • RELEVANCY SCORE 2.49

    DB:2.49:What Is Xi ? What Are The Role Of An Xi Consultant ? x1



    Hi Everybody,

    I am presently working as an ABAP Consultant since 3 years.Thinking for XI.

    bCan anybody tell me about XI.

    What are the role of an XI Consultant ?

    Is it a good option for an ABAPer ?/b

    bReward is assured/b

    bThanks in advance/b

    Srikanta Gope

    DB:2.49:What Is Xi ? What Are The Role Of An Xi Consultant ? x1


    bWhat is SAP XI?/b

    SAP Exchange Infrastructure is SAPs platform for process integration based on the exchange of XML messages.

    1. It provides a technical infrastructure for XML based message exchange in order to connect SAP components with each other as well as with non-SAP components.

    2. It delivers business process integration knowledge to the customer in the form of SAP pre-defined business scenarios.

    3. It provides an integrated tool set for building new business scenarios by defining and maintaining all integration relevant information. (Shared collaboration knowledge).

    Before we take a closer look at how the Exchange Infrastructure will enter into the IT landscape of every SAP customer, lets take a closer look at the capabilities as well as the strategic direction of XI. This particular module of Net Weaver is one of the most powerful and is undeniably the most critical. Its purpose is really three-fold:

    Connect:

    XI has the ability to connect all applications regardless of whether it is an application

    From a 3rd party or from SAP. The solution has pre-built connectivity to all SAP modules

    Such as SAP CRM and utilizes the Adapter Framework to integrate 3rd Party solutions

    such as Siebel, People Soft, Legacy systems, or AS/400s and Mainframes.

    Coordinate:

    XI has the ability to define a path/workflow for each business transaction that is

    Integrated. The system actively routes each message to ensure that it is properly

    Delivered from the source to the target destination. Active monitoring allows

    Administrators to manage document exchange on an exception basis.

    Communicate:

    XI has the ability to translate files into any format whether an internal file format or any

    Business to Business integration standard including but not limited to an XML format, an

    EDI format, a marketplace, or a Web Service. Finally, there are multiple communication

    Protocols included which allow the routing of a file over protocols such as s/FTP, http/s,

    SOAP, ebMS, Value-Added Networks, or EDI INT (AS1, AS2).

    Understanding The SAP Exchange Infrastructure_

    Now, you might be saying to yourself, we already have solutions that provide all of this

    Functionality. True, most organizations have invested previously in an integration strategy, but what we see in over 90% of organizations is that they have multiple translators and communication brokers, which they are supporting on a daily basis. This is both a resource drain as well as a monetary drain. For example, it is not uncommon to see the following even in smaller organizations:

    Multiple Point to Point connectivity: For example, R/3 connected to a 3rd party

    Warehouse Management Solution via an internally developed adapter or with the SAP

    Business Connector

    A 3rd party EAI Integration Broker to connect legacy mainframe systems to SAP and

    WMS

    A 3rd party EDI translator to communicate messages

    A 3rd party XML broker to communicate XML messages to marketplaces and non-EDI

    Trading partners

    A communication server that focuses on sending messages via FTP, Value-Added

    Networks and Internet protocols such as AS2 solution of choice for SAP end users

    Interface-

    bRole of XI consultant/b

    As a SAP XI Developer you will be required to : Gather requirements, develop specifications and technical documentation. Perform requirement analysis and high and low level design. Perform the coding, testing and integration mapping Interface with onsite / offshore project teams ,sometimes responsible for developing java applications based on clients requirement specifications, preparing the technical design document, creating prototypes, analyzing and identifying performance bottle-necks, providing technical and user documentation and training to client, providing relevant data to the Module Leader for status reports both.

    bIt's a good option to switch to XI/b

    regards,

    srinivas

    b*reward for useful answers*/b

  • RELEVANCY SCORE 2.49

    DB:2.49:Cutover Activities. xs


    Hi All,What are the "cutover activities" maintained in SD in the Phase GO LIVE SUPPORT.regards,vas.

    DB:2.49:Cutover Activities. xs

    Hi Vas,Cut Over Plans Detailed plans need to be developed for cutting over from the old system(s) to the new. Parallel runs of what will happen over the conversion period using test data, convert and watch for a period after wards to ensure nothing unexpected happens. Train Users Well trained users will support and defend the system on site. Unsupportive users will continually undermine the system and eventually it will be replaced. Therefore the more effort you put into helping the users master the system early the better. Fit gap means, before implementing the SAP all the business data is in the form of documents, we cannot keep this data as is in the SAP. There should be a gap. So by filling this gap, we make configuration with the help of these documents. This is called as fit gap analysis.Cut over activities are mainly in final preparation before go live i). Legacy system shutdown and ii). All finished goods uploaded from legacy system to sap iii). And linking old number ranges to new number rangesiv). Uploading all transport requests v). End user trainingCUT OVER STRATEGY:Cutover strategy depends upon how the organizations design their data load strategies. Normally, you decide the sequence of Data loads for Configuration settings, Master data, Transaction data which follows whom and then you make a copy of the system as a Production system a day before and after checking the successful data loads, you go-live 100% or partial again depending upon organizational setup and policies. Cutover planning is highly site specific. There's no thumb rule. The stock data as on the date of going live should be correctly entered. But stock being a highly dynamic quantity, the strategy for loading should be crystal clear. Then you have to load all the back dated transaction on the stock. Some stock comes into your plant/storage location as return and some stock is actually delivered to your customer through sales orders of various kinds.As example, in simple words for MDM (master data maintenance) it means that after cutover - all data will be used of MDM and not legacy systems. For central master data scenario; Data before cutover date will be maintained in all systems and after cutover date, it will be maintained in MDM only.Data can be uploaded using BDC programs, LSMW for master data and CATT is also being used.Cutover strategy is nothing but the last step before shifting from legacy system to SAP. The following activities are carried out in cutover strategy.rthis includes tasks such as the reviewing of the runtime of test runs to estimate runtime for the complete data size. A conversion checklist for transporting all changes into the productive system is provided for all the configuration settings to be imported.At this stage, it is important to verify that required tasks have been successfully completed, for example, that the technical environment is in place, the cutover programs are ready and the application data is verified. Approval is now sought from project management and company senior management to start the cutover process.As soon as you know when you will go live with the R/3 System or with new R/3 applications you should inform SAP. Thus you can ensure that SAP can provide optimal support throughout your going-live phase. For the last weeks before and first weeks after the go-live date, SAP offers the R/3 GoingLive Customer Care Service, accessible via SAPNet and OSS.Cutover Plan - The details of how to move to the production environment and go live. Ensuring that all master data to be loaded to production server is ready in correct format. User training is conducted user is in a comfort or atleast managable position to work on production server. Preparation of user manual. All go-live preparatory activities.Open Client activity:The activity or configuration to be done in production server, by opening an client should be ensured that it is done before go-live.Cutover ActivitiesAt the end of Phase 4, it is necessary to refine and validate the cutover plans generated in the Realization phase. Among other things, this includes tasks such as the reviewing of the runtime of test runs to estimate runtime for the complete data size. A conversion checklist for transporting all changes into the productive system is provided for all the configuration settings to be imported.At this stage, it is important to verify that required tasks have been successfully completed, for example, that the technical environment is in place, the cutover programs are ready and the application data is verified. Approval is now sought from project management and company senior management to start the cutover process.Here you can also refer to the Data Transfer Made Easy Guidebook created especially for this purpose. It is located in the Knowledge Corner of the ASAP CD.The help desk is particularly important in the first weeks after going live, but you will require help desk support throughout the productive life of your R/3 System.An internal help desk should be staffed and supported mainly by employees of the enterprise. Setting up a help desk involves, among other things, installing office and technical equipment and defining OSS users. Problems which cannot be solved by this internal help desk are forwarded to SAP via the OSS system.As soon as you know when you will go live with the R/3 System or with new R/3 applications you should inform SAP. Thus you can ensure that SAP can provide optimal support throughout your going-live phase. For the last weeks before and first weeks after the go-live date, SAP offers the R/3 GoingLive Customer Care Service, accessible via SAPNet and OSS.Check these links for few more important and Frequently asked SD Interview Questions and I hope these may help you a lot to shape yourself for an Interviewhttp://www.sap-img.com/sap-sd/short-sap-sd-questions-1.htmhttp://www.sap-img.com/sap-sd/short-sap-sd-questions-2.htmhttp://www.sap-img.com/sap-sd/short-sap-sd-questions-3.htmcutover activities.Please Reward If Really Helpful,Thanks and Regards,Sateesh.Kandula

  • RELEVANCY SCORE 2.49

    DB:2.49:Cutover Constraints pc



    Hi Guys,

    What are the constraints from the client side during cutover w.r.to PP Module? How do we address them?

    Regards

    Sravan

    DB:2.49:Cutover Constraints pc


    Dear

    As far as the Cutover activites are concerned the point which is critical and needs to be taken care is the WIP(Work in Progress ) part and the master data upload.

    WIP = Goods issued to an order + Confirmations done to that particular order ( Order is still being executed and not fully confirmed)

    a) Try clearning the shopfloor to Zero WIP before Golive (this should solve most of your problems)

    b) At the time of Cutover only Raw materials and finished materail shall be in stock

    Check the Master data upload for PP

    a) Material Master views b)PRTs c) BOMs d)Work Centres e)Routings f)inspection characteristics

    Hope the above helps.

    Jade

  • RELEVANCY SCORE 2.49

    DB:2.49:Open Transactional Items During Cutover mm


    What are all the Open transactional items w.r.t FICO we need to migrate in a typical SAP Data Migration project just before cutover?Some of the things which i am aware is Open A/P and Open A/R.Thanks in advance for your answer.

    DB:2.49:Open Transactional Items During Cutover mm

    That would be a great thing for me.Thanks in advance for your support.If you have any releated documents, you can kindly share at my email - bangaloredreams@gmail.comThanks

  • RELEVANCY SCORE 2.48

    DB:2.48:Abap Role In The Enterprise Portal? ps



    Can anyone give me a clear picture abt the enterprise protal and abap role in that?

    DB:2.48:Abap Role In The Enterprise Portal? ps


    hi,

    your requirement was not clear.

    But one usual requirement is to upload roles from ABAp system to portal. Check the followin glink...It gives in detail all the information abour Abap roles and Ep

    [http://help.sap.com/saphelp_nw70/helpdata/EN/0a/d2f0418102c417e10000000a155106/frameset.htm]

  • RELEVANCY SCORE 2.48

    DB:2.48:Cutover? cd



    Dear Gurus...

    please explain...

    what is cut-over in SAP BI?what are cutover activites?what is cutover action plan?

    Thanks in advance for a valuable help and quick reply is much appreciated.

    Regards

    RamChandra

    DB:2.48:Cutover? cd


    Hi Chandra..

    Cutover: is The process of transitioning from one system to a new one

    Cutover Action Plan : All documentation related to planning, preparing and executing cutover, describing how to lock down the system from a technical change management perspective, preparing the TSO for its new role and rolling out the SAP graphical user interface to all future end users.

    Activities : They freez the OLTP loadings into the OLAP system so that the objects are being transported either from Dev -Quality or Quality- to Production. Usually these are preplanned time when you move the objects and try to check if all the objects are transported or not.

    Let me know if you are clear or need any further explanantion...

    Thanks,

    Sandhya

  • RELEVANCY SCORE 2.48

    DB:2.48:What Is The Role Abaper In Esoa/Esa za



    Hi Gurus,

    Can anybody let me know, what is the role of ABAP Consultant in ESOA.

    It looks like Basis is involed more in that.

    I would like to know where ABAPer comes into picture in ESA/ESOA in terms of role played by him.

    Thanks in advance.

    -B S B

    DB:2.48:What Is The Role Abaper In Esoa/Esa za


    Hi Please let me know the role of ABAP developer

  • RELEVANCY SCORE 2.48

    DB:2.48:Custom Report/Function Module To Create Role j9



    Hi guys,

    I want create a RFC which will take role with authorization details given by user as input parameter, once we excute this function module we should get role with mentioned authorization. can any one tell me what approach should i take to write this ABAP or is there any report which creates the role with mention authorization provided by SAP.

    thanks in advance.

    regards,

    John.

    DB:2.48:Custom Report/Function Module To Create Role j9


    Hi John,

    If you do a where use list on this function module, it will find one example how SAP is using it. You also try to use PRGN_1250_READ_AUTH_DATA for a existing role to see how the structures are being populated. You will also need to assign a node number for new authorization. Also check function modules PRGNNODE.

  • RELEVANCY SCORE 2.47

    DB:2.47:Cutover Related Task 18



    I am working in an SNP implementation in ITC infotech bangalore.....

    can some one pls list out... what are the most common tasks and issues during cutover...Pls provide as much info as u can...if possible you can irect me to any relevant material/consulting notes also....Thanks a lot

    Anand

    DB:2.47:Cutover Related Task 18


    Cutover Activities are mostly based on the business processes you are implementing.

    How you are going to switch over from one system to SAP-APO

    Following data you have to ensure how to bring in SAP-APO System with the SNP project implementation

    1) Master data

    2) transaction data

  • RELEVANCY SCORE 2.47

    DB:2.47:Re: Use Of Sap_J2ee_Admin Role In Abap While Having No Permission In Ume j9



    Hi,

    i know that if we are using ABAP+JAVA stacks we need to have SAP_J2EE_ADMIN to do administration on J2EE side. i have a question on this.

    1. Do we map SAP_J2EE_ADMIN role to a portal role or assigning a user in ABAP with role SAP_J2EE_ADMIN will automatically gives him the ability to create a user in UME or any admin functions in J2EE

    2. what happens if user has SAP_J2EE_ADMIN role in ABAP system with out having access to Netweaver J2EE Engine, can he create users in JAVA side without actually logging in there.

    i am little confused about this role.

    Thanks,

    SS

  • RELEVANCY SCORE 2.47

    DB:2.47:Abap Consultant Role In Support Project 3c


    himay i knowabap consultant role in support projectand support stpes

    DB:2.47:Abap Consultant Role In Support Project 3c

    Hi, 1. Need to check the tickets. 2. Based on priority find the bugs and rectify. 3. Check the jobs that daily execute, If any failure then reexecute that with proper inputs... 4. Update the status in tickets. Over all what technical person is doing the same thing needs to be done in Support projects.Rgds,Bujji

  • RELEVANCY SCORE 2.47

    DB:2.47:Grc- Cutover/Golive Activities List as



    Hello All

    We will approaching practice cutovers next month for GRC Access controls and wanted to validate aming the forum what the exhaustive list of Cutover and Golive activities are with respect to the 4 GRC-AC components.

    If anybody has a list and sequence please post them here or inform me: khannat2 gmail

    thks

    DB:2.47:Grc- Cutover/Golive Activities List as


    Make sue that the PRD GRC is pointed/connected at the PRD R/3 Servers (always a good start) and test them.

    CC - you need rulset upload files to be created

    AE - you need workflow configuration documented

    FF - make sure you have sufficient background jobs set up to collect the information

    Make sure that the FireFighter users, controllers, owners etc have the correct access

    In Target systems

    Make sure that correct versions (NH and HR) versions of the RTA are installaed

    Make sure that the latest versiosn of the RTAs are installed

    Make sure that your RFC user(s) have appropriate access rights

    Make sure that the logon groups have been set to external access

    In General

    Install the latest patches to AC 5.2

  • RELEVANCY SCORE 2.47

    DB:2.47:Utp And Utr 98



    what is the role of ABAP Programmer in UTP UTR. Please give me scenario

    DB:2.47:Utp And Utr 98


    Check this site for more information.

    http://www.sap-img.com/general/role-of-sap-consultant-in-testing.htm

    Regards,

    Maha

  • RELEVANCY SCORE 2.47

    DB:2.47:What Is ' Workbench' And Cutover Strategy 88



    hi Gurus

    Can any one plese tel me

    1 . what is ' WORKBENCH'

    Why we use it and when?

    2. what is CUTOVER STRATEGY

    when we use it and why?

    Thanks and Regards

    babi

  • RELEVANCY SCORE 2.46

    DB:2.46:Is Company Code Activation (Set To Productive) Typically Included In Mock Cutover s9



    Hello.

    In a typical mock cutover, is the setting of the Company Code to productive typically included?

    Given that it can be re-set, I can't think of a down side to doing so. I'm just looking for what is standard practice.

    Thanks.

    DB:2.46:Is Company Code Activation (Set To Productive) Typically Included In Mock Cutover s9


    Hi David,

    The purpose of Company Code set to Productive is mainly to prevent any inadvertent deletion of data by the users like resetting depreciation data, deleting vendors / customers etc. For example, If one of your cut-over task is to delete the some of transaction data in your test system, then you need to remove this tick and delete and then put it back. It all depends on your requirements, how you want to use this field.

    But, as far as production system is concerned, you MUST ensure you have selected this check box in OBY6 transaction code. Include this as a manual task in your cut-over plan. Otherwise, any inadvertent deletion of data would become very costly for the business.

    Hope this helps.

    Regards,

    Ravi

  • RELEVANCY SCORE 2.46

    DB:2.46:Abap Class - Friend cf



    Hello Forum,

    What is the 'Friend' defined in a Class?

    What is its role and how is it used together with Methods?

    Any easy to understand materials on Abap class would be greatly appreciated.

    Thanks!

    Best regards,

    S.Patel

    DB:2.46:Abap Class - Friend cf


    Hi,

    For Example Class A is the Super Class and Class B is the Sub Class. Then now i have written Class B name in Class A.

    ie (in Class A Friends Tab ie in SE24 Tcode).

    So that Class B can access Class A's Private Section also.

    If You won't mention Friend Class in Class A.Then You can access only Public and Protected Section only.

    In this Scenario Class A should tell that Class B is my Friend.

    (In Class A Friends Tab you have to write Class B Name)

    Then only Class Class B can access Public,Protected and Private Section'ss of Class A.

  • RELEVANCY SCORE 2.46

    DB:2.46:Cutover Activity p3



    Dear Gyes,

    I am working as Core team ,Can you give an idea for the cutover activity ,what data needs to be collected for cutover activity in case of MM

    do you have any sample templates,please forward to me

    Regards

    Sam

    Edited by: SAMEER sangani on Dec 28, 2007 12:15 PM

    DB:2.46:Cutover Activity p3


    Cutover Activities are the activities which are to be finished in a defined period of time, master Data Uploading Strategies Depending upon the when we are going live. As per that, you have to give the information to your core team. If you goling live at the middle you have to upload the all PL Account items and B/S Items. If you going live at the financial year start, you have to only Upload the B/S Items. Activities for Golive:

    1. G/L Master Upload Thru BDC or LSMW (TC-Fs00 and extended one co code to another company code Fs01)

    2. Vendor Master Upload Thru BDC Or LSMW (Will be Taken Care By MM)

    3. Customer Master Upload Thru BDC or LSMW (Will be Taken Care By SD)

    4. Asset Master Upload(Thru As90)

    5. Cost Element Master Upload

    6. Cost Center Master Upload

    7. Profit Center Master Upload

    8. G/L Balances Thru F-02

    10. Vendor Balances thru F-43

    11. Customer Balances thru F-22

    12. Customer Advances thru f-29

    13. Vendor Advances thryu F-48

  • RELEVANCY SCORE 2.46

    DB:2.46:Cutover In Wm sf



    Hi,

    please let me know the Cutover for WM in two Cases

    1. New implementation i.e. MM with WM.

    2. MM is alreday implemented. WM is being implemented. So What would be the cutover for this.

    Regards,

    Pardeep Malik

    DB:2.46:Cutover In Wm sf


    Hello Pardeep,

    Please go through the link provided by Mr. Jrgen L.

    Its a detailed document and data migration is defined case by case.

    Please post it here in case you require anything else regarding WM cutover and i will try my best to help you out with that.

    Thanks,

    Nikhil

  • RELEVANCY SCORE 2.45

    DB:2.45:Steps To Be Followed During "Cutover Activity" And "Data Migration" x1



    Dear Friends,

    Can any one tell the process that has to be taken care at the time of

    1. Cutover activity (at the 4th phase of ASAP methodology across all modules)

    2. Data Migration (across all module)

    Expecting the reply at the earliest.

    Regards,

    nms

    DB:2.45:Steps To Be Followed During "Cutover Activity" And "Data Migration" x1


    Hi,

    In the final preparation phase you complete your preparations, including testing, end user training, system management, and cutover activities. You also need to resolve all open issues in this phase. At this stage you need to ensure that all the prerequisites for your system to go live have been fulfilled.

    The various activities under taken for this are as following.

    Perform Cutover to Production System

    Transport to Production Environment

    Publish IAC to Production Web Servers

    Final Approval for Going Live

    Confirm Production Readiness

    Verify Users are Ready

    Data migration refers to the transfer of data from legacy system to the newly implemented ERP(SAP) system. The activities covered under this are deciding the strategy for data migration, take out the dump of legacy data, cleaning the data in discussion with business process owner and then finally uploading it in to SAP system. there are various tools and techniques such as LSMW available for this.

    Please reward points if I had been of help to you.

    Rgds

    Manish

  • RELEVANCY SCORE 2.45

    DB:2.45:What Is Application Server And Role Of It? 3f



    i need information about application layer in abap.

    DB:2.45:What Is Application Server And Role Of It? 3f


    Dear ,

    Application layer is the one where the real applications are developed, integrated and tested by the developers. The entire business logic is maintained at this level.

    Thanks,

    Jaten

  • RELEVANCY SCORE 2.44

    DB:2.44:Cutover Activities For Upgrade Project 88



    Experts

    What are the cutover support activities for the administration of the ECC 6.0 (SAP) upgrade project. Also please do let me know how to prepare cutover strategy , and how do we develp cutover plans.

    Regards,

    Mahesh

    DB:2.44:Cutover Activities For Upgrade Project 88


    Hi,

    Check this thread.

    CutOver activities in BI7.0 while doing production upgrade BI7.0 FromBW3.x

    Regards.

  • RELEVANCY SCORE 2.44

    DB:2.44:How To Run Depreciation For Asset Data Upload In Two Different Cutover Date zx



    Hello,

    There are 9 units in which for the 4 units Asset cutover date is 31.03.2012 and for other units its 05.06.2012

    Due to this please clarify my following points:

    1. For the same company code, can it be possible or not...

    2. If there is depreciation run in April and May,2012 for units whose cutover date is 31.03.2012 , how its going to affect the depreciation calculation for units whose cutover date is 05.06.2012

    3. What will be the right strategy to resolve this matter?

    regards

    DB:2.44:How To Run Depreciation For Asset Data Upload In Two Different Cutover Date zx


    Hello,

    There are 9 units in which for the 4 units Asset cutover date is 31.03.2012 and for other units its 05.06.2012

    Due to this please clarify my following points:

    1. For the same company code, can it be possible or not...

    2. If there is depreciation run in April and May,2012 for units whose cutover date is 31.03.2012 , how its going to affect the depreciation calculation for units whose cutover date is 05.06.2012

    3. What will be the right strategy to resolve this matter?

    regards

  • RELEVANCY SCORE 2.44

    DB:2.44:Many Question Rgd Sap Family(Abap,Isu....Ecc) 9m



    hi gems

    i want 2 know whats the different between

    SAP ABAP,

    SAP ABAP SYSTEM ANALYST,

    ABAP ISU....

    is any other new version r product in sap(ABAP4,NetWeaver7.0,ECC7.0)

    whats all that.. i know abap...

    whats diff between

    ECC,

    Web AS and

    NetWeaver ....

    can v run abap coding in NetWeaver .?....

    wht is the use of NetWeaver ?

    whats the role of JAVA person... ?

    is abap person compulsorily want to know JAVA...?

    is java takes the position of abaper's....?

    is most of the NetWeaver project was done in java than abap?

    and finally whats diff between dynpro and WebDynpro ??? i know the difference little bit only.like what is what... i need clear detail result... gud credit 4 gud responce....

    DB:2.44:Many Question Rgd Sap Family(Abap,Isu....Ecc) 9m


    hi for more about netwever check this...

    netwever

    regards,

    venkat.

  • RELEVANCY SCORE 2.44

    DB:2.44:Error During Import Abap Phase x1



    Hi Experts,

    We are installing ECC 6.0 system by system copy method and during the import ABAP phase we are facing a error as follows.

    DbSl Trace: ORA-1403 when accessing table SAPUSER

    (DB) INFO: connected to DB

    (DB) INFO: DbSlControl(DBSL_CMD_NLS_CHARACTERSET_GET): UTF8

    (RD) ERROR: unable to allocate memory

    This error is coming for SAPAPPL0 and SAPAPPL2 packages. All other packages are completed.

    Please let me know what has to be done.

    Regards,

    Surendra

    DB:2.44:Error During Import Abap Phase x1


    Hi Surendra ,

    Please paste SAPAPPL0.log and SAPAPPL2.log to assist you further on same.

    Thanks..

    Mohit

  • RELEVANCY SCORE 2.44

    DB:2.44:Cutover Activities In Bi pp


    Hi All,Please provide what are the Cutover Activities that we have to perform in BI.Thanks,Ram.

    DB:2.44:Cutover Activities In Bi pp

    Hi Ram,This is for Upgrade Project,1) Coordination between all the Teams ,R/3 BIW ,Users and Basis.2)Log out the Users in R/3 i. take Shut Down.3)clear the Delta Queues in RSA7 in R/3 so Run the V3 jobs.4)Go for the Upgrade5)Run the V3 job and Get data to RSA76)Pull the data to BIW.Check these too !!!!!!!!https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/e0c9c8be-346f-2a10-2081-https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/10564d5c-cf00-2a10-7b87-RgdsSVU123

  • RELEVANCY SCORE 2.44

    DB:2.44:Cutover Plan z3



    what is cut over plan mean?Can anyone explain in detail?

    sridhar

    DB:2.44:Cutover Plan z3


    refer: http://en.wikipedia.org/wiki/SAP_Implementation

    it explains all the related terms

  • RELEVANCY SCORE 2.44

    DB:2.44:Cutover Po 3a



    Dear All,

    What is cut over purchase order?Can you elaborate all types of purchase orders?

    DB:2.44:Cutover Po 3a


    HI

    Cutover PO are the open PO to be carried forward from legacy to SAP ...its just a naming convention ...

    u can call it legacy PO also

    You are talking about a document type for PO given name "cutover"... which u can see in ME21N ....

    ur consultant must have made a document type with name "cutover PO" for making cutover PO.. of legacy.... to help in tracking of legacy PO

    Thank You

  • RELEVANCY SCORE 2.44

    DB:2.44:Cutover Activity 3k



    Hi guys,

    During SD cutover activity apart for open Enquires, Quotations, Orders, Deliveries what other things we consider?.

    How recording can be done for this using SHDB?

    Please guide on above.

    Thanks

    Shiv

    DB:2.44:Cutover Activity 3k


    Hi guys,

    During SD cutover activity apart for open Enquires, Quotations, Orders, Deliveries what other things we consider?.

    How recording can be done for this using SHDB?

    Please guide on above.

    Thanks

    Shiv

  • RELEVANCY SCORE 2.44

    DB:2.44:Cutover Activityes p3



    hi friends

    what is cutover activityes . what type of activityes taken at cutover time.

    what is the responsibilityes of functional consultant at cutover time

    regards

    shiva

    DB:2.44:Cutover Activityes p3


    Hi,

    Just like you have cutover date to prepare your financial statements you also have cutover for GoLive. The activities to be carried over to prepare the data for final upload in the Production Client is called bCutover Strategy/b.

    It is the responsibility of the FI consultant to check whether the activies are being carriedout as scheduled.

    The preparation of Data for cutover is the clients responsibility.

    From the FI Side the some of the Cutover activities are as under.

    1. Check the fieldstatus groups, Screen layouts GL, Cust, Vend

    2. Open Posting Periods

    3. Sperate doc type for Initial Balances upload and no. range

    4. Sepate GL account for Initia Stock Upload

    5. Prepare LSMW for Master Data and Transaction data Upload

    Thanks

    VK

  • RELEVANCY SCORE 2.44

    DB:2.44:Urgent!!!!!!!!!!!!!!! 3z



    1 What is the Complete role of an ABAP Technical Consultant.

    2 Also provide the flow for testing an object

    DB:2.44:Urgent!!!!!!!!!!!!!!! 3z


    Hi,

    ABAP Technical consultant will be at two stage,One is in Implementation and other one is for support....

    Support guy(ABAPER) will want to work whenever the client will say to modify or to create a script etc.,Implementation the ABAPER will get a technical spec from the team lead and he want to work as per tht....

    In some companies thay will give a details spec,but in small companies it wont be there and we want toe explore it

    reward if useful

  • RELEVANCY SCORE 2.44

    DB:2.44:What Is Difference Between Cutover And Go Alive? a7



    What is difference between cutover and go alive?

    DB:2.44:What Is Difference Between Cutover And Go Alive? a7


    Hi,

    Cutover is the time taken for the upgrade/Implement to happen and the system to be available for the development team to start their work of loading data that was held up during technical upgrade period etc.

    Cutover Activities:Implementation Project

    1. Planned downtime of system if required ( this depends on the nature of data being pulled )

    2. Initialization of datasources ( filling up of setup tables if applicable )

    3. Loading the same to SAP BI

    4. Opening the system to users

    5. Start deltas to SAP BI

    Upgrade Project,

    1) Coordination between all the Teams ,R/3 BIW ,Users and Basis.

    2)Log out the Users in R/3 i. take Shut Down.

    3)clear the Delta Queues in RSA7 in R/3 so Run the V3 jobs.

    4)Go for the Upgrade

    5)Run the V3 job and Get data to RSA7

    6)Pull the data to BIW.

    Pls chk this links;

    http://en.wikipedia.org/wiki/SAP_Implementation

    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/e0c9c8be-346f-2a10-2081-

    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/10564d5c-cf00-2a10-7b87-

    Go-Live (Upgrade)would be the time taken for getting the system in sync with production with respect to data and getting back to full functionaity and full availability.

    Go-Live Activities:

    1.keep up to date Patch Levels

    2.Release the objects to production system

    3.Run the set ups in R/3 source system Initialize Loads in BW

    4.Schedule Batch jobs in R/3 system (Delta loads)

    5.schedule the process chains in BW .

    6.Performance tuning u2013 on going activity

    7.Enhancements - if any

    Regards

    CSM Reddy

  • RELEVANCY SCORE 2.44

    DB:2.44:Integration Test f8


    What are the different tests we do in implementation? in unit testing and integration testing( Relization phase) what is SD consultants role?

    DB:2.44:Integration Test f8

    Hi ,Unit Testing means testing Your Object as a unit, with out considering any dependencis of other objects;Testing the object for the functionality and testing with some test cases , testing the output based on the various inputs.Integration Testing: testing the object w.r.t to other modules also;if the data into your object is related to other modules, if the change in business scenario in one module is going to effect in other modules, so the integration between the functionality of all objects will be checked.After the required Configurations and Customizations are done, the testing is done by the functional consultants to see if it is in line with the business requirement. Found good, the end users also test it in the test server. Then they are moved to the production system.Please reward if useful.Thanks RegardsSadhu Kishore